This proposal is for an amendment to the Limited Operational Flexibility for an Environmental Compliance Approval (air & noise) No. A-500-1195263740 for TERRAPURE BR LTD., a secondary lead smelting and refining facility located in the City of Mississauga, Ontario.
This application is for a new Environmental Compliance Approval for the use and operation of a waste processing site to be used for the recycling, processing and transfer of solid non-hazardous waste generated from residential, industrial, institutional and commercial sectors.
An Environmental Compliance Approval with Limited Operational Flexibility (air & noise) was granted to Innocon Inc., for the operating site located at 235 Wicksteed Avenue, Toronto, Ontario.
The facility production limit is 2,400 cubic metres of ready-mix concrete per day.
September 12, 2024 - October 27, 2024 (45 days) Closed
Last updated
We have granted an amended Environmental Compliance Approval (air & noise) to Chemtrade Chemicals Canada Ltd., a facility that produces aluminum sulphate or alum solution through a batch process, located at 145 MacDougall Street in Thunder Bay, Ontario.
September 6, 2024 - October 21, 2024 (45 days) Closed
Last updated
We issued an amended Environmental Compliance Approval (air & noise) with Operational Flexibility to fischer Canada Stainless Tubing Inc., a tube manufacturing and shaping facility located in the City of Waterloo, Ontario.
February 20, 2018 - April 6, 2018 (45 days) Closed
Last updated
We have issued an Environmental Compliance Approval with Limited Operational Flexibility (air) to 931080 Ontario Inc. operating as Rahnmet, a non-ferrous foundry and fabrication facility producing and repairing steel, cast iron, and bronze parts for rock crushing machinery, located in the City of North Bay, Ontario.
A site specific Environmental Compliance Approval was granted to Desrosiers Geothermal Corporation to install vertical closed loop geothermal system inside the Arthur Meighen Building located at 25-55 St. Clair Avenue East, Toronto, Ontario.
August 14, 2024 - September 28, 2024 (45 days) Closed
Last updated
An amended Environmental Compliance Approval (air & noise) has been granted to Integrated Gas Recovery Services Inc., for its landfill gas electric generating facility located at 950 Plymouth Drive, Mississauga, Ontario.
Approval is granted to 2667804 Ontario Inc. ( Operating as Recycle City ) to operate the waste transfer/processing facility for acceptance and processing of solid non-hazardous waste, liquid industrial waste, and hazardous waste, liquid soil from hydrovac operations.
An Environmental Compliance Approval with Limited Operational Flexibility (air & noise) has been granted to CRH Canada Group Inc. (operating as Dufferin Concrete), a ready-mix concrete manufacturing facility, located in the City of Welland, Ontario.
November 1, 2018 - December 16, 2018 (45 days) Closed
Last updated
An Environmental Compliance Approval with Limited Operational Flexibility (Air & Noise) which replaces all the current Environmental Compliance Approvals for Air and Noise at this facility and includes the addition of new or historically unapproved sources for all emissions has been granted to Ryding-Regency Meat Packers Ltd., a slaughterhouse.
Approval has been granted for a new Environmental Compliance Approval (air & noise) for R. W. Tomlinson Limited, an asphalt production plant, located in the City of Ottawa, Ontario.