We are proposing an amendment to the Highway Traffic Act, O. Reg. 620/05 - High Occupancy Lanes for the purpose of allowing single-occupant licenced taxicabs and airport limousines in provincial HOV Lanes, on a permanent basis. Singles-occupant licenced taxis and limousines are currently allowed to use HOV lanes as part of a pilot program.
November 20, 2018 - January 4, 2019 (45 days) Closed
Last updated
This approval is for an amendment to an existing ECA (Air) for all emissions from the Dufferin Concrete Burlington facility, producing ready-mix concrete, for the purpose of revisions to the production limit, reconfiguration of on-site activities, addition of crushing operations, and a request for Limited Operational Flexibility.
An approval was issued to amend the Environmental Compliance Approval No. 5639-ABLLKT for St. Marys Cement Inc. (Canada) operating as CBM Ready Mix, a ready-mix concrete facility located in Burlington, Ontario.
October 7, 2019 - November 21, 2019 (45 days) Closed
Last updated
A new Environmental Compliance Approval (Sewage) No. 1402-BNWJ2J was issued for the stormwater management works to serve proposed Mac’s Convenience Store, gas bar and carwash located at 907 Eagleson Road, Ottawa, Ontario.
August 23, 2019 - October 7, 2019 (45 days) Closed
Last updated
Approval was granted for a new Environmental Compliance Approval (Air & Noise) with Limited Operational Flexibility for Majestic Marble Import Ltd., a counter top manufacturing facility located in the City of Vaughan, Ontario.
October 23, 2019 - December 7, 2019 (45 days) Closed
Last updated
This Environmental Compliance Approval (ECA) is for an amendment to an existing Environmental Compliance Approval (Sewage) for Beaver Valley Ski Club for a wastewater treatment system in Markdale, Ontario.
Gowest Gold Limited has submitted transmittal and certification replacement pages and a revised Financial Assurance table as an amendment to its Closure Plan for Advanced Exploration – Bradshaw Project of August 7, 2015.
Instrument type:
Approval for variance from the Liquid Fuels Handling Code
ERO number
019-1748
Notice type
Instrument
Notice stage
Proposal
Proposal posted
Comment period
May 4, 2020 - June 3, 2020 (30 days) Closed
Last updated
The applicant wants to replace several tank and dispenser sump entry boots (fittings that connect piping to a containment system) with retrofit boots made by Icon Products.
October 8, 2019 - November 22, 2019 (45 days) Closed
Last updated
Approval has been granted for an amendment to the Limited Operational Flexibility for an Environmental Compliance Approval (Air & Noise) No. 9194-92YJPR for Index Energy Ajax Corporation, a facility producing steam for industrial use and electricity for export to the grid, located in the Town of Ajax, Ontario.
Approval has been granted for an amendment to Environmental Compliance Approval (Air & Noise) No.7419-94HSFT with Limited Operational Flexibility for Irving Consumer Products Limited, a tissue manufacturing facility located in the City of Toronto, Ontario.
Approval has been granted for an amendment to the Limited Operational Flexibility for an Environmental Compliance Approval (Air & Noise) No. 2613-A66RB9, for all emissions from Morgan-Multivans Canada Corporation, a truck body manufacturing facility located in Bolton, Ontario.
October 31, 2019 - December 15, 2019 (45 days) Closed
Last updated
We have approved a new Environmental Compliance Approval for Irving Oil Limited for the establishment of stormwater management works in Cornwall, Ontario.
Instrument type:
Approval for variance from the Liquid Fuels Handling Code
ERO number
019-1742
Notice type
Instrument
Notice stage
Proposal
Proposal posted
Comment period
May 1, 2020 - May 31, 2020 (30 days) Closed
Last updated
2723579 ONTARIO INC. O/A CLARINGTON ESSO wants to leave two unused double-wall fibre-reinforced plastic underground tanks in the ground and to bring them back into service.
December 24, 2019 - February 7, 2020 (45 days) Closed
Last updated
A new Environmental Compliance Approval (ECA) for stormwater management works serving Hayshore Estates Subdivision was issued to Hay Family Development Inc. in the Township of Beckwith.
November 29, 2019 - December 30, 2019 (31 days) Closed
Last updated
A new Environmental Compliance Approval is granted to CosMic Plants Inc. for existing stormwater management facility serving the existing greenhouse site located at 4228 Maple Grove Road, in the town of Lincoln.
February 12, 2020 - March 28, 2020 (45 days) Closed
Last updated
An Environmental Compliance Approval (Sewage Works) was granted for the establishment of a seasonal subsurface sewage disposal works to service a proposed cottage located in the Township of Mapleton, Ontario.
Instrument type:
Approval for a consent (subject to conditions) in an area where there is no official plan in place
ERO number
019-1275
Notice type
Instrument
Notice stage
DecisionUpdated
Decision posted
Proposal posted
Comment period
February 5, 2020 - March 6, 2020 (30 days) Closed
Last updated
Application 60-C-203262 for a lot addition was approved on March 20, 2020 with conditions. Applicant has one (1) year to satisfy conditions otherwise approval will lapse.
October 9, 2019 - November 23, 2019 (45 days) Closed
Last updated
A new Environmental Compliance Approval (Industrial Sewage) has been granted for Shell Canada Limited/Shell Canada Limitee to service a gas bar located at 2130 Morningside Avenue in the City of Toronto, Ontario.