November 30, 2017 - January 15, 2018 (46 days) Closed
Last updated
We have made a decision to proceed with developing the Ontario voluntary carbon offsets program. Voluntary carbon offset credits are an additional mechanism to encourage greenhouse gas reductions (GHG) in Ontario beyond the coverage of the cap and trade program.
December 8, 2023 - January 22, 2024 (45 days) Closed
Last updated
An approval was issued to amend Environmental Compliance Approval (air & noise) No. 1057-8V9NMY for the renewal of the Operational Flexibility conditions for Opta Inc., a facility manufacturing synthetic slag, located at 871 Arvin Avenue in the City of Hamilton, Ontario.
An approval was issued to amend Environmental Compliance Approval (air & noise) No. 0004-AHJJKY for the renewal of the Limited Operational Flexibility conditions, for Glencore Canada Corporation, Fraser/Strathcona mine located in Onaping, Ontario.
We amended Renewable Energy Approval No. 3195-92JKTY for the Cornwall Solar Project, located at Pt Lot 5, 6 and 7, Concession 5, County Road 19 in the Township of South Glengarry, United Counties of Stormont, Dundas and Glengarry, to replace the existing ten intermediate transformers with ten new intermediate transformers in the same locations.
We amended Renewable Energy Approval No. 0602-8RFLKT for the Brockville Solar Project, located at Lot 19, Concession 2 in the Township of Elizabethtown-Kitley, to construct a tractor storage building and associated double-walled fuel storage tank, and an 11 m by 90 m stormwater management pond.
Following the receipt of a privately initiated application, the Minister of Municipal Affairs and Housing is consulting on the proposed amendment to the Minister’s Zoning Order, filed as Ontario Regulation 482/73, for lands municipally known as 5244 1 Sideroad in the City of Burlington, Halton Region.
This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (Air) for CRH Canada Group Inc., operating a ready-mix concrete batching plant located in the City of Toronto, Ontario.
An approval was issued to amend Environmental Compliance Approval (air & noise) No. 1640-AHKJGK for the renewal of the Limited Operational Flexibility conditions, for Glencore Canada Corporation, Strathcona mill located in Onaping, Ontario.
October 26, 2016 - December 12, 2016 (47 days) Closed
Last updated
Authorization from the Ministry of the Environment, Conservation and Parks is required to use or occupy any land in provincial parks and conservation reserves. This regulation will allow land associated with cottage lots in Algonquin Provincial Park to be used for certain private, non-commercial purposes. (e.g., docks and swim rafts).
October 18, 2023 - December 2, 2023 (45 days) Closed
Last updated
We have approved a new Environmental Compliance Approval No. 2936-DHGLJZ for York1 Tiffin Recycling Ltd. for the construction and operation of a waste disposal site (processing) located within a 1.639 hectares total site area located at 529 Tiffin Street in the City of Barrie.
An Environmental Compliance Approval (air and noise) with operational flexibility was issued for Opta Inc., a manufacturing facility producing carbide and magnesium-based powders and mixtures located in Norfolk County, Ontario.
An Environmental Compliance Approval (air & noise) was issued for Bristol Plating Inc., a powder coating facility, located in the City of Burlington, Ontario.
July 20, 2021 - September 3, 2021 (45 days) Closed
Last updated
An Environmental Compliance Approval with limited operational flexibility has been issued to all sources of air emissions from the Grakon Hamsar Holdings Ltd. facility located at 5320 Downey Street in Burlington.
August 4, 2023 - September 3, 2023 (30 days) Closed
Last updated
Certificate of Property Use No. 6872-CSZKYW was issued to Lakeview Community Partners Limited on September 14, 2023 as part of the development plans for the property.
December 13, 2024 - January 27, 2025 (45 days) Closed
Last updated
We have issued an Environmental Compliance Approval (air & noise) with Operational Flexibility to Active Metal Finishing Company Limited & Bristol Plating Inc., an electroplating facility located in the City of Toronto, Ontario.