Commentaire
The roads leading to this proposed dump were not build for the traffic of 400 passes of transport trucks a day. It is over 30 km to the nearest 4 lane highway with having to pass through a number of towns and villages. Not to mention the seasonal farm equipment traffic as this is one of the best agricultural lands in Ontario. Do you realize that some tractors and wagons only go 25 km a hour on these highways? How are your truckers going to feel about following farm equipment down the roads. You have to be extra cautious and patient in this farming community. I am opposed to the removal of the required EA
Soumis le 7 mai 2025 8:57 PM
Commentaire sur
Élimination des exigences en matière d’évaluation environnementale pour le projet de site d’élimination des déchets de York1
Numéro du REO
025-0389
Identifiant (ID) du commentaire
131449
Commentaire fait au nom
Statut du commentaire