Commentaire
As somebody living in the extended sphere of impact from a potential release of radioactive material from the Bruce, Pickering or Darlington plants I request to be adequately protected by my government and/or the operators of hose plants.
This includes detailed information on
- which accident scenarios are being considered in the emergency response plan
- what impacts to expect for which scenarios
- what preventative measures to take specifically for my location and situation
- where to turn to in the event of any of the above accident scenarios
- regular updates/reminders to be assured that the information provided is up to date
Further, I request access to the information about planned upgrade or refurbishment measures at the above plants including detailed scope, construction cost estimates, schedules and the impact on the rate base from these measures.A realistic feasibility report on viable alternatives, namely from expansion of renewable power programs including hydro, wind and solar is also requested.
[Original Comment ID: 210607]
Soumis le 15 février 2018 2:23 PM
Commentaire sur
Mise à jour du Plan directeur du PPIUN
Numéro du REO
013-0560
Identifiant (ID) du commentaire
2664
Commentaire fait au nom
Statut du commentaire