Commentaire
McDougall is hoping the the MTO plan also includes connecting to municipal bike lanes/ paths where ever possible .
Currently the MTO are planning on paving the shoulders on HWY 124 from McKellar to the 400 hwy. This would place a 1km gap between an existing bike lane connecting McDougall, Parry Sound , Sequin, and Carling Twp.
We are concerned this gap will place the riders coming from HWY 124 East in a very dangerous position.
PLEASE CONSIDER CONNECTING TO LOCAL BIKE LANES WHERE EVER POSSIBLE
THANK YOU
[Original Comment ID: 212926]
Soumis le 8 mars 2018 2:05 PM
Commentaire sur
Plan d'action 2.0 #VéloOntario
Numéro du REO
013-1837
Identifiant (ID) du commentaire
3849
Commentaire fait au nom
Statut du commentaire