Commentaire
- Ontario should set a target of moving to 100% renewable energy by 2050
- Ontario should maximize efficiency by paying full value (e.g., equal to the cost of nuclear) for conservation kilowatts
· Ontario should sign more long-term deals with Quebec to import lower cost and safer water power · Ontario should close the Pickering Nuclear Station when its licence expires in 2018.
· Ontario should actively plan to take nuclear off ramps from rebuilding Darlington and Bruce as soon as possible to save money and reduce risk
[Original Comment ID: 206779]
Soumis le 8 juin 2018 2:40 PM
Commentaire sur
Planning Ontario's Energy Future: A Discussion Guide to Start the Conversation.
Numéro du REO
012-8840
Identifiant (ID) du commentaire
4271
Commentaire fait au nom
Statut du commentaire