Ontario Power Generation Inc. - Environmental Compliance Approval (sewage)

La traduction française de cet avis n'est pas disponible. Nous nous excusons pour le dérangement.

Type d'acte: Environmental Compliance Approval (sewage)

Numéro du REO
019-8416
Numéro de référence du ministère
3807-D32MNY
Type d'avis
Instrument
Loi
Environmental Protection Act, R.S.O. 1990
Affiché par
Ministry of the Environment, Conservation and Parks
Étape de l'avis
Proposition
Proposition affichée
Période de consultation
Du 20 mars 2024 au 4 mai 2024 (45 jours) Fermé
Dernière mise à jour

Cette consultation a eu lieu :

du 20 mars 2024
au 4 mai 2024

Résumé de la proposition

The proposal is for an amendment to an existing Environmental Compliance Approval No. 2951-CPCMNQ for industrial stormwater management works serving the proposed expansion of the Ontario Power Generation Darlington site, located at Holt Road, in Darlington, Ontario.

Détails de l'emplacement

Adresse du site

1 Holt Road Street
Clarington, Canada

Carte de l'emplacement du site

L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.

Afficher cet emplacement sur une carte opens link in a new window

Promoteur(s)

Ontario Power Generation Inc.
1 Holt Road Street
Clarington, ON
L1C 3Z8
Canada

Détails de la proposition

The proposal is for an amendment to an existing Environmental Compliance Approval No. 2951-CPCMNQ for industrial stormwater management works serving the proposed expansion of the Ontario Power Generation Darlington site, located at Holt Road, in Darlington, Ontario.

The stormwater management works are associated with the proposed development of a construction access road to a proposed permanent storage area for surplus soil from site excavation and construction activities from the Darlington New Nuclear Project.

The works for this Environmental Compliance Approval amendment are for roadside ditches and an outlet enhanced swale for a north-south construction haul road, adjacent to Holt Road on the Darlington site. The works are within the Darlington Creek watershed and will comprise Stormwater Quality Control and Quantity Control via the enhanced swale, and Erosion and Sediment Control works during construction, and will discharge to existing drainage features north of the CN Rail corridor, and eventually to Darlington Creek.

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

Client Services and Permissions Branch
Address

135 St Clair Ave West
1st Floor
Toronto, ON
M4V 1P5
Canada

Office phone number

Commentaire

La consultation est maintenant terminée.

La période de consultation a eu lieu du 20 mars 2024
au 4 mai 2024

Communiquer avec nous

Contact

S'inscrire pour obtenir des avis

Nous vous enverrons des avis par courriel accompagnés de toute mise à jour liée à cette consultation. Vous pouvez modifier vos préférences relatives à l'avis en tout temps en allant à votre page de profil où se trouvent vos paramètres.

Suivre cet avis