Conestoga Cold Storage Limited - Environmental Compliance Approval (sewage)

La traduction française de cet avis n'est pas disponible. Nous nous excusons pour le dérangement.

Type d'acte: Environmental Compliance Approval (sewage)

Numéro du REO
019-8824
Numéro de référence du ministère
2659-D5JKPS
Type d'avis
Instrument
Loi
Environmental Protection Act, R.S.O. 1990
Affiché par
Ministry of the Environment, Conservation and Parks
Étape de l'avis
Décision
Décision publiée
Période de consultation
Du 17 juin 2024 au 1 août 2024 (45 jours) Fermé
Dernière mise à jour

Cette consultation a eu lieu :

du 17 juin 2024
au 1 août 2024

Résumé de la décision

Establishment of industrial stormwater management works for the collection, transmission, treatment and disposal of stormwater run-off from a total catchment area of 11.41 hectares (to be developed for a Refrigerated Warehousing and Storage Facility), to Enhanced Level water quality, erosion protection and quantity control.

Détails de l'emplacement

Adresse du site

16408 Steeles Avenue
Halton Hills , ON
Canada

Carte de l'emplacement du site

L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.

Afficher cet emplacement sur une carte opens link in a new window

Promoteur(s)

Conestoga Cold Storage Limited
299 Trillium Drive
Kitchener, ON
N2E 1W9
Canada

Détails de la décision

Establishment of industrial stormwater management Works for the collection, transmission, treatment and disposal of stormwater run-off from a total catchment area of 11.41 hectares (to be developed for a Refrigerated Warehousing and Storage Facility), to provide Enhanced Level water quality protection and erosion control.

This is also to attenuate post-development peak flows to pre-development or allowable peak flows for all storm events up to and including the 100-year storm event, discharging to the existing Sixteen Mile Creek, consisting of Enhanced Grassed swales, located along the north and south property lines of the site around the perimeter,on-site storm sewers, two (2) Infiltration tanks, and Treatment in a lined wetland/wet pond with 2 sediment forebays, outlet control structure, four (4) 500 mm diameter outlet pipes and a 300 mm deep, 30.0 m wide emergency spillway to avoid pond flooding in case of unusual storms and regualra outlet pipe blockage.

The pondwater ultimately to discharge at a combined peak flow rate of 0.963 m3/s during the 1:100 year storm under ultimate development conditions into existing twin 1200 mm diameter corrugated steel pipe culvert under Highway 407 and into an existing MTO stormwater management pond prior to release to a tributary to 16 Mile creek; 

Commentaires reçus

Par l'entremise du registre

0

Par courriel

0

Par la poste

0
Consulter les commentaires soumis par l'entremise du registre

Effets de la consultation

No comments came in during the 45 days EBR posting period.

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

Halton-Peel District Office
Address

4145 North Service Road
Suite 300
Burlington, ON
L7L 6A3
Canada

Office phone number
Client Services and Permissions Branch
Address

135 St Clair Ave West
1st Floor
Toronto, ON
M4V 1P5
Canada

Office phone number

How to Appeal

Cet avis de décision peut être porté en appel. Vous avez jusqu’à 15 jours à partir du 5 septembre 2024 pour entamer le processus d’appel.

Veuillez lire les renseignements suivants attentivement pour en savoir plus sur le processus d’appel.

Comment interjeter appelClick to Expand Accordion

Start the process to appeal

If you’re an Ontario resident, you can start the process to appeal this instrument decision.

First, you’ll need to seek leave (i.e. get permission) from the relevant appellate body to appeal the decision.

If the appellate body grants leave, the appeal itself will follow.

Seek leave to appeal

To seek leave to appeal, you need to do these three things:

  1. prepare your application
  2. provide notice to the minister
  3. mail your application to three parties

1. Prepare your application

You’ll need to prepare an application. You may wish to include the following things in your application:

  1. A document that includes:
    • your name, phone number, fax number (if any), and/or email address
    • the ERO number and ministry reference number (located on this page)
    • a statement about whether you are a resident in Ontario
    • your interest in the decision, and any facts you want taken into account in deciding whether you have an interest in the decision
    • the parts of the instrument that you’re challenging
    • whether the decision could result in significant harm to the environment
    • the reason(s) why you believe that no reasonable person – having regard to the relevant law and to any government policies developed to guide decisions of that kind – could have made the decision
    • the grounds (facts) you’ll be using to appeal
    • the outcome you’d like to see
  2. A copy of the instrument (approval, permit, order) that you you are seeking leave to appeal. You’ll find this in the decision notice on the Environmental Registry
  3. Copies of all supporting documents, facts and evidence that you’ll be using to appeal
What is considered

The appeal body will consider the following two questions in deciding whether to grant you leave to appeal:

  1. is there is good reason to believe that no reasonable person, with respect to the relevant law and to any government policies developed to guide decisions of that kind, could have made the decision?
  2. could the decision you wish to appeal result in significant harm to the environment?

2. Provide your notice

You’ll need to provide notice to the Minister of the Environment, Conservation and Parks that you’re seeking leave to appeal.

In your notice, please include a brief description of the:

  • decision that you wish to appeal
  • grounds for granting leave to appeal

You can provide notice by email at minister.mecp@ontario.ca or by mail at:

College Park 5th Floor, 777 Bay St.
Toronto, ON
M7A 2J3

3. Mail your application

You’ll need to mail your application that you prepared in step #1 to each of these three parties:

  • appellate body
  • issuing authority (the ministry official who issued the instrument)
  • proponent (the company or individual to whom the instrument was issued)

Autorité compétente
Sherif Hegazy M Sc. P. Eng
Manager

Environmental Permission Branch
135 St Clair Avenue West
7th Floor
Toronto, ON
M4V 1P5
Canada

416 562 7910

Proponent(s)

Conestoga Cold Storage Limited
299 Trillium Drive
Kitchener, ON
N2E 1W9
Canada


Organe d’appel

Registrar, Ontario Land Tribunal
655 Bay Street, Suite 1500
Toronto, Ontario
M5G 1E5
(416) 212-6349
(866) 448-2248
OLT.Registrar@ontario.ca

About the Ontario Land Tribunal


Inclure les éléments suivants:

Numéro du REO
019-8824
Numéro de référence du ministère
2659-D5JKPS

Il ne s'agit pas d'un avis juridique. Veuillez vous reporter à la Charte des droits environnementaux de 1993 pour connaître les exigences exactes prévues par la loi. Consultez un avocat si vous avez besoin d'aide avec le processus d'appel.

Communiquer avec nous

Contact

S'inscrire pour obtenir des avis

Nous vous enverrons des avis par courriel accompagnés de toute mise à jour liée à cette consultation. Vous pouvez modifier vos préférences relatives à l'avis en tout temps en allant à votre page de profil où se trouvent vos paramètres.

Suivre cet avis

Proposition initiale

Numéro du REO
019-8824
Numéro de référence du ministère
2659-D5JKPS
Type d'avis
Instrument
Loi
Environmental Protection Act, R.S.O. 1990
Affiché par
Ministry of the Environment, Conservation and Parks
Proposition affichée

Période de consultation

17 juin 2024 - 1 août 2024 (45 days)

Détails de la proposition

The proposal is for a new Environmental Compliance Approval for industrial stormwater management works serving Conestoga Cold Storage, located in the Town of Halton Hills at 16408 Steeles Avenue (formerly 7869 10th Line).

The stormwater management works comprise of Stormwater Quality Control, Quantity Control, and Erosion Control Works (during construction) designed to support full build out of the industrial parcel straddling both sides of the former 10th Line south of Steeles Avenue.

The works are proposed to include a network of on-site catchbasins, maintenance holes, storm sewers/ditches, below grade and surface storage, and a stormwater management wet pond complete with two inlet forebays. The system will discharge to a culvert under Highway 407 and into an MTO stormwater management pond prior to release to a tributary to 16 Mile Creek.

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

Client Services and Permissions Branch
Address

135 St Clair Ave West
1st Floor
Toronto, ON
M4V 1P5
Canada

Office phone number

Commentaire

La consultation est maintenant terminée.

Cette consultation a eu lieu 17 juin 2024
au 1 août 2024

Communiquer avec nous

Contact