Update Announcement
This proposal notice has been updated on April 07, 2026 to advise the public that this application is still under active review. The original proposal date and comment period have not been altered.
Cette consultation a eu lieu :
du 9 août 2024
au 23 septembre 2024
Résumé de la proposition
This proposal is for a new Environmental Compliance Approval (sewage) for Miller Paving Limited to establish stormwater management works to service a proposed industrial manufacturing plant, located at 175 Bethridge Road, in the City of Toronto, Ontario.
Détails de l'emplacement
Adresse du site
175 Bethridge Road
Toronto,
ON
Canada
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
Miller Paving Limited
281 Hillmount Road
Suite 101
Markham,
ON
L6C 2S3
Canada
Détails de la proposition
This proposal is for a new Environmental Compliance Approval (sewage) for Miller Paving Limited to establish stormwater management works to service a proposed industrial manufacturing plant for collection, transmission, treatment and disposal of stormwater run-off from the lands located at 175 Bethridge Road, in the City of Toronto, Ontario.
The proposed stormwater management works include an underground storage tank, complete with storm sewers. Runoff generated on the site will be captured through a series of double catch basins and conveyed through 200-525 millimetre diameter storm sewers into a stormwater facility before ultimately discharging to the existing 600 millimetre culvert at the southeast corner of the site.
Storage is provided within the stormwater facility, proposed pipes and the structures for storm events up to the 100-year. Stormwater from the Site will be attenuated though an orifice tube into the Jellyfish Filter, and then discharged to the existing 600 millimetre culvert. Furthermore, stormwater runoff generated from the plant’s operation area, where there is potential contamination, will be conveyed overland to the water recycle facility.
The flows up to the major (100-year) storm event generated in the operation area will be contained/stored in the compartment of the water recycle facility and will be pumped back to the plant to be re-used for the plant operations. The grading and servicing have been designed in this manner to avoid discharging any contaminated stormwater off site.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Commentaire
La consultation est maintenant terminée.
La période de consultation a eu lieu du 9 août 2024
au 23 septembre 2024