Conditional Filing Order [Bell Creek Facility].

La traduction française de cet avis n'est pas disponible. Nous nous excusons pour le dérangement.

Numéro du REO
025-0086
Type d'avis
Bulletin
Loi
Mining Act, R.S.O. 1990
Affiché par
Ministry of Mines
Date d’affichage
Dernière mise à jour

Le présent avis est fourni à titre d’information seulement. Il n’existe aucune obligation de mener une consultation sur le Registre environnemental de l’Ontario à propos de cette initiative. Pour en savoir davantage sur le processus de consultation et les types d’avis publiés sur le registre.

Résumé de l’avis

We have received a request for a Conditional Filing Order (bell creek facility) that will result in (lake shore gold, a subsidiary of pan american silver) submit a closure plan amendment (CPA) that does not meet all statutory requirements at the time of submission.

Pourquoi une consultation n’est pas nécessaire

Conditional Filing Orders are not currently prescribed as an instrument under the Environmental Bill of Rights, however, the Ministry of Mines is undertaking the work to have this decision prescribed. While that work is being completed, the Ministry is posting for public consultation as an information posting.

Détails

The requirement(s) being deferred in the next closure plan submission through this Conditional Filing Order (CFO) request are:

  1. Updated Certified Crown Pillar Long-Term Stability Geotechnical Report
  2. Updated ARD/ML Certified Report
  3. Updated Certified Groundwater Monitoring Program Plan
  4. Certified Closure Physical Stability Surveillance, Monitoring and Assessment Plan for the Tailings Facility

The absence of the requirement(s) will not impair the proponent’s ability to determine adequate rehabilitation measures for all mine hazards associated with the project for the following reasons:

  1. Crown Pillar instability during operations is considered low-risk as failure propagation to surface is very unlikely. No future stopes being planned within 150 metres of topographic surface.
  2. There have been no ARD/ML concerns within the Bell Creek Geochemistry program. Overburden is made up of all local organics.
  3. The current groundwater monitoring program is compliant with code. All wells monitored onsite.
  4. The site has a robust tailings management system already in place based on Canadian Dam Association Guidelines and the Mining Association of Canada’s Towards Sustainable Mining Tailings Management Protocol. Existing rehabilitation strategy provided and in place.

This notice is provided to receive comments that can be considered in the decision-making process prior to the issuance of a Conditional Filing Order.

Unless specified in the order itself, the Conditional Filing Order does not relieve the proponent from compliance with any other requirements that are set out under the Mining Act or any other Act.

Proponents must meet the requirements outlined in Ontario Regulation 35/24 to minimize the impacts to public health, safety and the environment from early exploration activities described above.

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

Mineral Development Office (Timmins)
Address

5520 Highway 101 E Highway
PO Box 3060
South Porcupine Ontario, ON
P0N 1H0
Canada

Office phone number

Communiquer avec nous

Contact

Amanda Rantala

Phone number
Office
Mineral Development Office (Northeast), Ontario Government Complex
Address

5520 Highway 101 East
PO Box 3060
South Porcupine, ON
P0N 1H0
Canada

S'inscrire pour obtenir des avis

Nous vous enverrons des avis par courriel accompagnés de toute mise à jour liée à cette consultation. Vous pouvez modifier vos préférences relatives à l'avis en tout temps en allant à votre page de profil où se trouvent vos paramètres.

Suivre cet avis