Lake Nipigon Forest Sustainable Energy Solutions Inc. - Environmental Compliance Approval (air)

La traduction française de cet avis n'est pas disponible. Nous nous excusons pour le dérangement.

Type d'acte: Environmental Compliance Approval (air)

Numéro du REO
025-0142
Numéro de référence du ministère
6080-DBPSN8
Type d'avis
Instrument
Loi
Environmental Protection Act, R.S.O. 1990
Affiché par
Ministry of the Environment, Conservation and Parks
Étape de l'avis
Proposition
Proposition affichée
Période de consultation
Du 10 mars 2025 au 24 avril 2025 (45 jours) Ouvert
Dernière mise à jour

Cette consultation se termine à 23 h 59 le :
24 avril 2025

Résumé de la proposition

This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (air and noise)from Lake Nipigon Forest Sustainable Energy Solutions Inc.’s facility, that will produce renewable natural gas and biocarbon, and is located in the Unorganized Township of Lyon, Ontario.

Détails de l'emplacement

Adresse du site

0 Lofty Davies Road
Lyon , ON
Canada

Carte de l'emplacement du site

L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.

Afficher cet emplacement sur une carte opens link in a new window

Promoteur(s)

Lake Nipigon Forest Sustainable Energy Solutions Inc.
3134 Kam Current Road
Nipigon, ON
P0T 1X0
Canada

Détails de la proposition

This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (air and noise) for a new facility to be built in Lyon, Ontario and includes the addition of new or historically unapproved sources for all emissions from Lake Nipigon Forest Sustainable Energy Solutions Inc.’s facility, that will produce renewable natural gas and biocarbon, and is located in the Unorganized Township of Lyon, Ontario.

The emission sources from the manufacturing and associated processes that discharge to the air include:

  • pyrolysis kiln train exhaust systems,
  • a dust collector,
  • biocarbon storage silos, and
  • a gravity separator (de-stoner)

Emissions to the air from this facility include:

  • nitrogen oxides,
  • coal tar pitch volatiles – soluble fraction,
  • particulate matter, and
  • noise

The Environmental Compliance Approval with Limited Operational Flexibility (air and noise), when issued permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (air and noise). The Limited Operational Flexibility conditions have an expiry date. The company will be required to make an application for amendment at that time to renew these conditions.

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

Client Services and Permissions Branch
Address

135 St. Clair Avenue West
Floor 1
Toronto, ON
M4V 1P5
Canada

Office phone number

Commentaire

Dites-nous ce que vous pensez de notre proposition.

Vous avez des questions? Contactez la personne-ressource indiquée ci-dessous. Veuillez indiquer le numéro du REO de l’avis dans votre courriel ou votre lettre à la personne-ressource.

Lire nos politiques relatives aux commentaires et à la protection de la vie privée.

Soumettre en ligne

Soumettre par la poste

Contact

Communiquer avec nous

Contact

S'inscrire pour obtenir des avis

Nous vous enverrons des avis par courriel accompagnés de toute mise à jour liée à cette consultation. Vous pouvez modifier vos préférences relatives à l'avis en tout temps en allant à votre page de profil où se trouvent vos paramètres.

Suivre cet avis