I.A. Fletcher Holdings Inc. - Environmental Compliance Approval (sewage)

La traduction française de cet avis n'est pas disponible. Nous nous excusons pour le dérangement.

Type d'acte: Environmental Compliance Approval (sewage)

Numéro du REO
025-0710
Numéro de référence du ministère
6184-DGUR6L
Type d'avis
Instrument
Loi
Environmental Protection Act, R.S.O. 1990
Affiché par
Ministry of the Environment, Conservation and Parks
Étape de l'avis
Proposition
Proposition affichée
Période de consultation
Du 26 juin 2025 au 10 août 2025 (45 jours) Fermé
Dernière mise à jour

Cette consultation a eu lieu :

du 26 juin 2025
au 10 août 2025

Résumé de la proposition

This proposal is for a new Environmental Compliance Approval Industrial Sewage application for I.A. Fletcher Holdings Inc. This application is for the collection, transmission and disposal of stormwater runoff at I.A. Fletcher Holdings Inc.’s Compost Facility (waste transfer and processing facility) located at 310 Riverside Drive, Nanticoke.

Détails de l'emplacement

Adresse du site

310 Riverside Drive, Nanticoke
Haldimand , ON
Canada

Carte de l'emplacement du site

L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.

Afficher cet emplacement sur une carte opens link in a new window

Promoteur(s)

I.A. Fletcher Holdings Inc.
3558 Haldimand Road 20, Dunnville
Haldimand, ON
N1A 2W3
Canada

Détails de la proposition

This proposal is for a new Environmental Compliance Approval (ECA) Industrial Sewage application for I.A. Fletcher Holdings Inc. This application is for the collection, transmission and disposal of stormwater runoff at I.A. Fletcher Holdings Inc.’s Compost Facility (waste transfer and processing facility) located at 310 Riverside Drive, Nanticoke, Ontario (site).

The proposed stormwater management (SWM) works include upgrades to existing swales, installation of new vegetated swales, an oil/grit separator (OGS) unit, and a water quality treatment wet pond equipped with isolation valves at the outlet structure. Stormwater from the Site will be directed to the vegetated swales and conveyed to the downstream OGS unit and wet pond to provide treatment for all stormwater runoff from the proposed development prior to ultimately discharging towards Nanticoke Creek. This treatment train approach is intended to improve water quality from the entire Site and promote controlled discharge to the natural environment.

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

Client Services and Permissions Branch
Address

135 St Clair Ave West
1st Floor
Toronto, ON
M4V 1P5
Canada

Office phone number

Commentaire

La consultation est maintenant terminée.

La période de consultation a eu lieu du 26 juin 2025
au 10 août 2025

Communiquer avec nous

Contact

S'inscrire pour obtenir des avis

Nous vous enverrons des avis par courriel accompagnés de toute mise à jour liée à cette consultation. Vous pouvez modifier vos préférences relatives à l'avis en tout temps en allant à votre page de profil où se trouvent vos paramètres.

Suivre cet avis