The 2018 Closure Plan Amendment for the Williams Mine was filed by the Director of Mine Rehabilitation with changes addressed in the Closure Plan Amendment Update dated January 31, 2019 to address government technical reviews.
Détails de l'emplacement
Détails de l'emplacement du site
The Williams Mine is located approximately 35km east of Marathon, Ontario or approximately 245km east of Thunder Bay, Ontario along the Trans-Canada Highway 17.
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
Barrick-Hemlo (Williams Operating Corporation )
Post Office Bag Delivery Bag 500
Marathon,
ON
P0T 2E0
Canada
Détails de la décision
The 2018 Closure Plan Amendment for the Williams Mine was filed by the Director of Mine Rehabilitation with changes addressed in the Closure Plan Amendment Update dated January 31, 2019 to address government technical reviews.
Effets de la consultation
No comments were received resulting in no impact on the decision whether or not to proceed with this proposal.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
435 James Street South
Suite B002
Thunder Bay,
ON
P7E 6E3
Canada
How to Appeal
Les appels ne sont pas autorisés
Ce type d’acte ne peut être porté en appel. En savoir plus sur notre processus de consultation.
Communiquer avec nous
Contact
Mark O'Brien
435 James Street South
Suite B002
Thunder Bay,
ON
P7E 6E3
Canada
Proposition initiale
Détails de la proposition
Description of Instrument
Barrick-Hemlo has submitted a Mine Closure Plan for filing by the Ministry of Northern Development and Mines as required under the Mining Act. This Closure Plan proposes rehabilitation measures to be implemented upon the eventual closure of Barrick-Hemlo’s Williams Mine.
The following are the major components of this Closure Plan as proposed by Barrick-Hemlo
Rehabilitation measures adjusted to extend the current mine life from 2021 to 2027 which includes:
- Thickened tailings deposition in the Williams Basin
- Sulfide tailings deposition with water cover in the David Bell Basin
- Installation of a desulfurization plant
- Addition of a water treatment plant in 2090 for waste rock piles and pit lake area
- Corresponding increase in financial assurance
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
933 Ramsey Lake Road
Level B6
Sudbury,
ON
P3E 6B5
Canada
Commentaire
La consultation est maintenant terminée.
Cette consultation a eu lieu 3 août 2018
au 2 septembre 2018
Communiquer avec nous
Contact
Mark O'Brien
435 James Street South
Suite B002
Thunder Bay,
ON
P7E 6E3
Canada
Commentaires reçus
Par l'entremise du registre
0Par courriel
0Par la poste
0