Greenwich Windfarm GP Inc. - Environmental Compliance Approval (air)

La traduction française de cet avis n'est pas disponible. Nous nous excusons pour le dérangement.

Type d'acte: Environmental Compliance Approval (air)

Numéro du REO
026-0734
Numéro de référence du ministère
1913-DUQNLW
Type d'avis
Instrument
Loi
Environmental Protection Act, R.S.O. 1990
Affiché par
Ministry of the Environment, Conservation and Parks
Étape de l'avis
Décision
Décision publiée
Période de consultation
Du 16 juillet 2026 au 30 août 2026 (45 jours) Fermé
Dernière mise à jour

Cette consultation a eu lieu :

du 16 juillet 2026
au 30 août 2026

Résumé de la décision

Approval has been granted to amend the Environmental Compliance Approval (noise) No. 2070-7WJKDH for Greenwich Windfarm GP Inc. for the wind farm operation in the Township of Dorion, Ontario.

Détails de l'emplacement

Adresse du site

870 Greenwich Lake Road
Dorion, ON
Canada

Carte de l'emplacement du site

L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.

Afficher cet emplacement sur une carte opens link in a new window

Promoteur(s)

Greenwich Windfarm GP Inc.
870 Greenwich Lake Road
Dorion, ON
P0T 1K0
Canada

Détails de la décision

Approval has been granted to amend the Environmental Compliance Approval (noise) No. 2070-7WJKDH for Greenwich Windfarm GP Inc. for the wind farm operation in the Township of Dorion, Ontario.

The Project currently consists of 43 as-built wind turbine generators (WTGs) and a transformer substation, equipped with 2 transformers.

This application is to reflect the as-built transformer substation locations.

Commentaires reçus

Par l'entremise du registre

1

Par courriel

1

Par la poste

0
Consulter les commentaires soumis par l'entremise du registre

Effets de la consultation

The ministry received one comment during the 45 day comment period from July 16 to August 30, 2026. The ministry also received another comment via email on October 9, 2026. The two comments were in reference to the lack of detail within the proposal notice to reflect the as-built transformer substation locations.

The Greenwich Wind Farm has an Environmental Compliance Approval (ECA) No. 2070-7WJKDH under the Environmental Protection Act, as the facility was approved before Ontario Regulation 359/09: Renewable Energy Approvals Under Part V.0.1 of the Act came into force.

The proposal is to update Schedule B in the amended ECA to include the locations of the as-built transformer substation. The Greenwich Wind Farm, consisting of 43 wind turbines and one transformer substation (equipped with two transformers) has been in commercial operation since 2011.

The only change as part of this amendment application is to reflect the final as-built layout of the transformer substation in the ECA.

An updated Acoustic Assessment Report (2026) was submitted as part of the application, and the assessment demonstrates that the noise levels from the facility will continue to comply with applicable MECP sound level limits at all identified points of reception. There are no noise-sensitive receptors located within 1,500 metres of the wind turbines or transformer substation.

Greenwich Windfarm GP Inc. must ensure that the facility is operating in compliance with their ECA.

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

Client Services and Permissions Branch
Address

40 St. Clair Avenue West
Floor 2
Toronto, ON
M4V 1M2
Canada

Office phone number
MECP Thunder Bay District
Address

435 James Street South
3rd Floor, Suite 331B
Thunder Bay, ON
P7E 6S7
Canada

Office phone number

How to Appeal

Cet avis de décision peut être porté en appel. Vous avez jusqu’à 15 jours à partir du 23 octobre 2026 pour entamer le processus d’appel.

Veuillez lire les renseignements suivants attentivement pour en savoir plus sur le processus d’appel.

Comment interjeter appelClick to Expand Accordion

Start the process to appeal

If you’re an Ontario resident, you can start the process to appeal this instrument decision.

First, you’ll need to seek leave (i.e. get permission) from the relevant appellate body to appeal the decision.

If the appellate body grants leave, the appeal itself will follow.

Seek leave to appeal

To seek leave to appeal, you need to do these three things:

  1. prepare your application
  2. provide notice to the minister
  3. mail your application to three parties

1. Prepare your application

You’ll need to prepare an application. You may wish to include the following things in your application:

  1. A document that includes:
    • your name, phone number, fax number (if any), and/or email address
    • the ERO number and ministry reference number (located on this page)
    • a statement about whether you are a resident in Ontario
    • your interest in the decision, and any facts you want taken into account in deciding whether you have an interest in the decision
    • the parts of the instrument that you’re challenging
    • whether the decision could result in significant harm to the environment
    • the reason(s) why you believe that no reasonable person – having regard to the relevant law and to any government policies developed to guide decisions of that kind – could have made the decision
    • the grounds (facts) you’ll be using to appeal
    • the outcome you’d like to see
  2. A copy of the instrument (approval, permit, order) that you you are seeking leave to appeal. You’ll find this in the decision notice on the Environmental Registry
  3. Copies of all supporting documents, facts and evidence that you’ll be using to appeal
What is considered

The appeal body will consider the following two questions in deciding whether to grant you leave to appeal:

  1. is there is good reason to believe that no reasonable person, with respect to the relevant law and to any government policies developed to guide decisions of that kind, could have made the decision?
  2. could the decision you wish to appeal result in significant harm to the environment?

2. Provide your notice

You’ll need to provide notice to the Minister of the Environment, Conservation and Parks that you’re seeking leave to appeal.

In your notice, please include a brief description of the:

  • decision that you wish to appeal
  • grounds for granting leave to appeal

You can provide notice by email at minister.mecp@ontario.ca or by mail at:

College Park 5th Floor, 777 Bay St.
Toronto, ON
M7A 2J3

3. Mail your application

You’ll need to mail your application that you prepared in step #1 to each of these three parties:

  • appellate body
  • issuing authority (the ministry official who issued the instrument)
  • proponent (the company or individual to whom the instrument was issued)

Autorité compétente
Neryed Ragbar
Manager (A) Priority Project Approvals

Environmental Permissions Branch
135 St Clair Avenue West
Floor 3
Toronto, ON
M4V 1P5
Canada

437-776-8348

Proponent(s)

Greenwich Windfarm GP Inc.
870 Greenwich Lake Road
Dorion, ON
P0T 1K0
Canada


Organe d’appel

Registrar, Ontario Land Tribunal
655 Bay Street, Suite 1500
Toronto, Ontario
M5G 1E5
(416) 212-6349
(866) 448-2248
OLT.Registrar@ontario.ca

About the Ontario Land Tribunal


Inclure les éléments suivants:

Numéro du REO
026-0734
Numéro de référence du ministère
1913-DUQNLW

Il ne s'agit pas d'un avis juridique. Veuillez vous reporter à la Charte des droits environnementaux de 1993 pour connaître les exigences exactes prévues par la loi. Consultez un avocat si vous avez besoin d'aide avec le processus d'appel.

Communiquer avec nous

Contact

Partager

Courriel

Facebook

X

S'inscrire pour obtenir des avis

Nous vous enverrons des avis par courriel accompagnés de toute mise à jour liée à cette consultation. Vous pouvez modifier vos préférences relatives à l'avis en tout temps en allant à votre page de profil où se trouvent vos paramètres.

Suivre cet avis

Proposition initiale

Numéro du REO
026-0734
Numéro de référence du ministère
1913-DUQNLW
Type d'avis
Instrument
Loi
Environmental Protection Act, R.S.O. 1990
Affiché par
Ministry of the Environment, Conservation and Parks
Proposition affichée

Période de consultation

16 juillet 2026 - 30 août 2026 (45 days)

Détails de la proposition

This proposal is to amend the Environmental Compliance Approval (noise) No. 2070-7WJKDH for Greenwich Windfarm GP Inc. for the wind farm operation in the Township of Dorion, Ontario.

The Project currently consists of 43 as-built wind turbine generators (WTGs) and a transformer substation, equipped with 2 transformers.

This application is to reflect the as-built substation transformer locations.

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

Client Services and Permissions Branch
Address

40 St. Clair Avenue West
Floor 2
Toronto, ON
M4V 1M2
Canada

Office phone number

Commentaire

La consultation est maintenant terminée.

Cette consultation a eu lieu 16 juillet 2026
au 30 août 2026

Communiquer avec nous

Contact