Cette consultation a eu lieu :
du 15 septembre 2026
au 30 octobre 2026
Résumé de la proposition
This proposal is to amend Environmental Compliance Approval (Air & Noise) No. 9619-BG7JNC issued to Niagara Energy Products, Inc. manufacturers of storage containers used to support the nuclear power industry at a facility located in the City of Niagara Falls, Ontario.
Détails de l'emplacement
Adresse du site
4749 Buttrey Street
Niagara Falls,
ON
Canada
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
Niagara Energy Products, Inc.
4749 Buttrey Street
Niagara Falls,
ON
L2E 7K7
Canada
Détails de la proposition
This proposal is to amend Environmental Compliance Approval (Air & Noise) No. 9619-BG7JNC issued to Niagara Energy Products, Inc. manufacturers of storage containers used to support the nuclear power industry at a facility located in the City of Niagara Falls, Ontario.
This amendment was prepared to acknowledge the process of replacing damaged or non-functional fume extraction devices on-Site.
Contaminant emissions to the atmosphere include:
- manganese,
- nitrogen oxides,
- nickel,
- chromium (hexavalent),
- slag,
- talc, and
- particulate matter.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
40 St. Clair Avenue West
Floor 2
Toronto,
ON
M4V 1M2
Canada
Communiquer avec nous
Contact
Client Services and Permissions Branch
40 St. Clair Avenue West
Floor 2
Toronto,
ON
M4V 1M2
Canada
Commentaire
La consultation est maintenant terminée.
La période de consultation a eu lieu du 15 septembre 2026
au 30 octobre 2026