Cette consultation se termine à 23 h 59 le :
9 janvier 2027
Résumé de la proposition
This proposal is for an amendment to Environmental Compliance Approval No. 5762-6VLLYE, issued to GFL Environmental Inc. for the use and operation of a waste disposal site.
Détails de l'emplacement
Adresse du site
Lot 9, Concession B
Commanda,
ON
Canada
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
GFL Environmental Inc.
100 New Park Place
Vaughan,
ON
L4K 0H9
Canada
Détails de la proposition
This proposal is for an amendment to an existing Environmental Compliance Approval (ECA No. 5762-6VLLYE, issued on August 24, 2025) for the use and operation of a waste disposal site (waste transfer/processing site) (site). The Owner is seeking approval to replace the currently approved waste storage building with a new building.
The Site is situated on a 131.28-hectare property, located along the north section of the Trans-Canada Highway, and about 7 kilometres to the west of the City of North Bay, Ontario. The land surrounding the site is mainly forested, with Lake Nipissing situated about 900 metres to the south of the property. Access to the Site is provided via a laneway extending north from Highway 17.
The Site had a 2,700 square metres waste storage building. Additional features at the Site include a weigh scale, and a maintenance building. The proposed new waste structure would be approximately 1,860 square metres in area and located centrally within the Site.
The Site is approved to receive solid non-hazardous waste consisting mainly of recyclable materials. Any non-recyclable waste shall be separated and removed from the Site to an approved waste disposal facility. The recyclable waste will be stored at the Site and removed to an appropriate waste management facility for further processing. The Site is approved to store up to 400 tonnes of waste at any one time and receive up to 80 tonnes per day. The service area is the Province of Ontario. There is no change in the type of materials, volume of storage material, or daily maximum. All waste will continue to be unloaded indoors.
The proposed change /new operation at the Site is summarized as follows:
- The construction and use of a new waste storage building constructed of concrete and tent structure, approximately 1,860 square metres, located centrally to the Site.
- Removal/cleanup of the old building.
- A new fuel-powered generator to power the building.
No other operational changes to any existing or approved operations are proposed at the Site.
The waste disposal site will continue to serve the Province of Ontario. The hours of operation of the Site will remain the same as follows:
- Monday through Friday between 6 a.m. and 8 p.m.; and
- Saturday between 7 a.m. and 4 p.m.
As there is no change in the storage or daily volumes permitted at the Site, there is no change in the traffic volumes.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
40 St. Clair Avenue West
Floor 2
Toronto,
ON
M4V 1M2
Canada
Communiquer avec nous
Contact
Client Services and Permissions Branch
40 St. Clair Avenue West
Floor 2
Toronto,
ON
M4V 1M2
Canada
Commentaire
Dites-nous ce que vous pensez de notre proposition.
Vous avez des questions? Contactez la personne-ressource indiquée ci-dessous. Veuillez indiquer le numéro du REO de l’avis dans votre courriel ou votre lettre à la personne-ressource.Lire nos politiques relatives aux commentaires et à la protection de la vie privée.
Soumettre en ligne
Soumettre par la poste
Contact
Client Services and Permissions Branch
40 St. Clair Avenue West
Floor 2
Toronto, ON
M4V 1M2
Canada