Cette consultation se termine à 23 h 59 le :
26 décembre 2026
Résumé de la proposition
This proposal is for a new Permit to Take Water for construction and cooling water purposes. Water will be taken from one lake source to support the cooling and auxiliary systems associated with the tunnel boring machine operations, with minor volumes used for construction purposes (e.g. grout, washing, dust control).
Détails de l'emplacement
Adresse du site
1675 Montgomery Park Road
Pickering,
ON
L1V 2R5
Canada
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
Ontario Power Generation Inc.
1908 Colonel Sam Drive
Oshawa,
ON
L1H 8P7
Canada
Détails de la proposition
This proposal is for a new Permit to Take Water for construction and cooling water purposes to refurbish the Ontario Power Generation Pickering Nuclear Generating Station. Water will be taken from one lake source to support the cooling and auxiliary systems associated with the tunnel boring machine operations, with minor volumes used for construction purposes (e.g., grout, washing, dust control). Details of the water taking are as follows:
Application type – New
Source Name: Lake Ontario
- Purpose: construction - cooling water
- Maximum rate per minute (litres): 2,500
- Maximum number of hours of taking per day: 24
- Maximum volume per day (litres): 3,600,000
- Maximum number of days of taking per year: 365
- Earliest calendar date of taking (mm/dd): 01/01
- Latest calendar date of taking (mm/dd): 12/31
- Period of taking: 36 months
There are 3 categories of Permit to Take Water application:
- Category 1 applications are considered low-risk and are unlikely to pose unacceptable impacts
- Category 2 applications require a Qualified Person to undertake a scoped scientific evaluation to ensure the withdrawal of water does not result in unacceptable impacts or interference with other users. The evaluation should also demonstrate that the taking meets one of the Category 2 criteria
- Category 3 applications must submit a detailed hydrogeological study and/or surface water study prepared by a Qualified Person for ministry review. The study will evaluate the potential for unacceptable impacts resulting from the water taking
According to the application criteria presented in the Permit to Take Water application guide, the proposed water taking qualifies as a Category 2 application. Any proposals for groundwater or surface water takings that do not meet the Category 1 or Category 2 application criteria are considered to be Category 3 applications.
For more information, refer to the Permit to Take Water application guide using the website link below:
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
40 St. Clair Avenue West
Floor 2
Toronto,
ON
M4V 1M2
Canada
Communiquer avec nous
Contact
Client Services and Permissions Branch
40 St. Clair Avenue West
Floor 2
Toronto,
ON
M4V 1M2
Canada
Commentaire
Dites-nous ce que vous pensez de notre proposition.
Vous avez des questions? Contactez la personne-ressource indiquée ci-dessous. Veuillez indiquer le numéro du REO de l’avis dans votre courriel ou votre lettre à la personne-ressource.Lire nos politiques relatives aux commentaires et à la protection de la vie privée.
Soumettre en ligne
Soumettre par la poste
Contact
Client Services and Permissions Branch
40 St. Clair Avenue West
Floor 2
Toronto, ON
M4V 1M2
Canada