Update Announcement
The amendment was returned for the director on April 28, 2023.
Cette consultation a eu lieu :
du 2 décembre 2016
au 1 janvier 2017
Résumé de la décision
On April 28, 2023, the Director of Mine Rehabilitation returned the certified amendment for refiling.
Détails de l'emplacement
Détails de l'emplacement du site
Kirkland Lake Gold’s Complex located in Holloway and Holt Townships, District of Cochrane.
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
Kirkland Lake Gold Inc.
1350 Government Road West
Post Office Box Delivery 370
Kirkland Lake ,
ON
P2N 3J1
Canada
Détails de la décision
On April 28, 2023, the Director of Mine Rehabilitation returned the certified amendment for refiling.
Effets de la consultation
On April 28, 2023, the Director of Mine Rehabilitation returned the certified amendment for refiling.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
933 Ramsey Lake Road
Level B6
Sudbury,
ON
P3E 6B5
Canada
How to Appeal
Les appels ne sont pas autorisés
Ce type d’acte ne peut être porté en appel. En savoir plus sur notre processus de consultation.
Communiquer avec nous
Contact
Desmond O'Connor
5520 Highway 101 East
PO Box 3060
South Porcupine,
ON
P0N 1H0
Canada
Proposition initiale
Détails de la proposition
Description of instrument
Kirkland Lake Gold Inc. has submitted a Mine Closure Plan Amendment for filing by the Ministry of Energy, Northern Development and Mines as required under the Mining Act. This Closure Plan proposes rehabilitation measures to be implemented upon the eventual closure of Kirkland Lake Gold’s Holloway-Holt Complex. The rehabilitation work to be conducted will include but not limited to removal of site buildings and infrastructure, construction of spillways, appropriate signage, contouring of waste rock piles, revegetation and monitoring.
The following are the major components of this Closure Plan as proposed by Kirkland Lake Gold Inc.:
- expanding the underground operations at both the Holloway and Holt (Shaft #3) sites
- increase the capacity of the tailings impounds area as well as upgrades to the dams
- include the use of tailings as paste fill
- expand the existing Mattawasaga pits, within the existing footprint of the Holt site
- include the Ghost Zone access from the Holt Mine underground
- add the Tousignant Site and required support infrastructure, in the immediate vicinity of the Holt Mine (accessed through internal mine road)
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
933 Ramsey Lake Road
Level B6
Sudbury,
ON
P3E 6B5
Canada
Commentaire
La consultation est maintenant terminée.
Cette consultation a eu lieu 2 décembre 2016
au 1 janvier 2017
Communiquer avec nous
Contact
Andrew Persad
5520 Highway 101 East
PO Box 3060
South Porcupine,
ON
P0N 1H0
Canada
Commentaires reçus
Par l'entremise du registre
0Par courriel
0Par la poste
0