Il n’existe aucune obligation d’afficher cet avis sur le Registre environnemental de l’Ontario, mais nous voulons connaître votre opinion. Soumettez un commentaire et donnez-nous votre avis. Pour en savoir davantage sur le processus de consultation et les types d’avis publiés sur le registre.
Update Announcement
A decision for this proposal has been published as a Bulletin under ERO 019-2023 on June 30, 2020.
Cette consultation a eu lieu :
du 2 avril 2020
au 17 mai 2020
Résumé de la proposition
This proposal is for a new Environmental Compliance Approval for municipal storm sewers, sanitary sewers and stormwater management works serving Lanark Lifestyles Ltd., located at 240 Gore Street East, in the Town of Perth.
Détails de l'emplacement
Adresse du site
240 Gore Street East
Perth,
ON
Canada
Détails de l'emplacement du site
Perth Senior's Complex
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
Lanark Lifestyles Ltd.
240 Gore Street East
Perth,
ON
K7H1K9
Canada
Pourquoi une consultation n’est pas nécessaire
On April 1, 2020, the Ontario Government made a temporary regulation to respond to the COVID-19 outbreak. Ontario Regulation 115/20 exempts all proposals for policies, acts, regulations and instruments from posting requirements under the EBR until 30 days after the declared emergency is terminated.
Détails de la proposition
This proposal is for a new Environmental Compliance Approval for municipal storm sewers, sanitary sewers and stormwater management works serving Lanark Lifestyles Ltd., located at 240 Gore Street East, in the Town of Perth.
The stormwater management works for the development include stormwater quality (enhanced level) control and quantity (100 year post-development to 5 year pre-development) control. The on-site storm system is comprised of catch basins, storm sewers and oil/grit separator(s).
Drainage from the southern portion of the development will discharge to the existing drainage ditch on Rideau Ferry Road before being conveyed to the Tay River and ultimately to the Rideau River.
Drainage from the northern portion of the development will discharge to the existing drainage ditch on South Street before being conveyed to the existing storm sewer system on Gore Street East.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Commentaire
La consultation est maintenant terminée.
La période de consultation a eu lieu du 2 avril 2020
au 17 mai 2020