Il n’existe aucune obligation d’afficher cet avis sur le Registre environnemental de l’Ontario, mais nous voulons connaître votre opinion. Soumettez un commentaire et donnez-nous votre avis. Pour en savoir davantage sur le processus de consultation et les types d’avis publiés sur le registre.
Update Announcement
A decision for this proposal has been published as a Bulletin under ERO 019-4605 on August 25, 2022.
Cette consultation a eu lieu :
du 20 avril 2020
au 4 juin 2020
Résumé de la proposition
This proposal is for a new Environmental Compliance Approval to be issued to Frontier Lithium Inc. for the installation of an industrial sewage works for the collection, transmission, treatment and disposal of sewage, in support of a proposed Lithium Advanced exploration at 175 km north of the Town of Red Lake, District of Kenora, Ontario.
Détails de l'emplacement
Adresse du site
Kenora,
ON
P0V 2M0
Canada
Détails de l'emplacement du site
175 km north of Red Lake
Unsurveyed Territory (Kenora Area Office) Unorganized Area
PAK Lithium Project
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
Frontier Lithium Inc.
2736 Belisle Drive
Val Caron,
ON
P3N 1B3
Canada
Pourquoi une consultation n’est pas nécessaire
On April 1, 2020, the Ontario Government made a temporary regulation to respond to the COVID-19 outbreak. Ontario Regulation 115/20 exempts all proposals for policies, acts, regulations and instruments from posting requirements under the EBR until 30 days after the declared emergency is terminated.
Détails de la proposition
This proposal is for a new Environmental Compliance Approval, with an option for Limited Operational Flexibility, to be issued to Frontier Lithium Inc.
This proposal is for the installation of an industrial sewage works from an open pit bulk sample and pilot plant. The works are for the collection, transmission, treatment and disposal of sewage, in support of a proposed Lithium Advanced exploration at 175 km north of the Town of Red Lake, District of Kenora, Ontario.
The works consist of a low permeability containment facility to store water and with dewatering bags containing tailings, water treatment plant and pumping system, a water pond to manage process water, mine water and stormwater, discharging into Flanagan River, within the Whiteloon Lake Watershed, in accordance with established effluents limits.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Commentaire
La consultation est maintenant terminée.
La période de consultation a eu lieu du 20 avril 2020
au 4 juin 2020