Il n’existe aucune obligation d’afficher cet avis sur le Registre environnemental de l’Ontario, mais nous voulons connaître votre opinion. Soumettez un commentaire et donnez-nous votre avis. Pour en savoir davantage sur le processus de consultation et les types d’avis publiés sur le registre.
Update Announcement
A decision for this proposal has been published as a Bulletin under ERO# 019-1907 on June 10, 2020.
Cette consultation a eu lieu :
du 28 avril 2020
au 28 mai 2020
Résumé de la proposition
This proposal is for an amendment to the existing Permit No. 8342-B8HK9Y issued to Penguin-Calloway (Vaughan) Inc. to support dewatering activities related to a proposed construction at 175 Millway Avenue, in Vaughan, Ontario. This amendment seeks to increase the temporary construction water taking to& 3,550,000 litres per day.
Détails de l'emplacement
Adresse du site
175 Millway Avenue
Vaughan,
ON
Canada
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
Penguin-Calloway (Vaughan) Inc.
3200 Highway 7
Vaughan,
ON
L4K 5Z5
Canada
Pourquoi une consultation n’est pas nécessaire
On April 1, 2020, the Ontario Government made a temporary regulation to respond to the COVID-19 outbreak. Ontario Regulation 115/20 exempts all proposals for policies, acts, regulations and instruments from posting requirements under the EBR until 30 days after the declared emergency is terminated.
Détails de la proposition
This proposal is for an amendment to the existing Permit No. 8342-B8HK9Y to support Penguin-Calloway (Vaughan) Inc. Project for dewatering activities related to a proposed construction at 175 Millway Avenue, in Vaughan, Ontario.
This amendment is being requested to increase the temporary construction water taking from the current 528,900 L/day to 3,550,000 L/day. There are four (4) sources of taking (drilled wells) for construction dewatering and the details of water taking are as follows:
Permit type - amendment to Permit No. 8342-B8HK9Y (Category 3)
Purpose of water taking: construction dewatering
Source of water: drilled well PW1
- maximum rate (litres per minute): 616.5
- maximum number of hours of taking per day: 24
- maximum volume (litres) per day: 887,500
- maximum number of days of taking in a year: 365
- earliest calendar date of taking (mm/dd): 01/01
- latest calendar date of taking (mm/dd): 12/31
- period of water taking: 4 years
Source of water: drilled well PW1
- maximum rate (litres per minute): 616.5
- maximum number of hours of taking per day: 24
- maximum volume (litres) per day: 887,500
- maximum number of days of taking in a year: 365
- earliest calendar date of taking (mm/dd): 01/01
- latest calendar date of taking (mm/dd): 12/31
- period of water taking: 4 years
Source of water: drilled well PW2
- maximum rate (litres per minute): 616.5
- maximum number of hours of taking per day: 24
- maximum volume (litres) per day: 887,500
- maximum number of days of taking in a year: 365
- earliest calendar date of taking (mm/dd): 01/01
- latest calendar date of taking (mm/dd): 12/31
- period of water taking: 4 years
Source of water: drilled well PW3
- maximum rate (litres per minute): 616.5
- maximum number of hours of taking per day: 24
- maximum volume (litres) per day: 887,500
- maximum number of days of taking in a year: 365
- earliest calendar date of taking (mm/dd): 01/01
- latest calendar date of taking (mm/dd): 12/31
- period of water taking: 4 years
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
Communiquer avec nous
Contact
Permit To Take Water Coordinator (Central Region)
5775 Yonge Street
Floor 8
Toronto,
ON
M2M 4J1
Canada
Commentaire
La consultation est maintenant terminée.
La période de consultation a eu lieu du 28 avril 2020
au 28 mai 2020