Il n’existe aucune obligation d’afficher cet avis sur le Registre environnemental de l’Ontario, mais nous voulons connaître votre opinion. Soumettez un commentaire et donnez-nous votre avis. Pour en savoir davantage sur le processus de consultation et les types d’avis publiés sur le registre.
Update Announcement
A decision for this proposal has been published as a Bulletin under ERO 019-3899 on June 23, 2021
Cette consultation a eu lieu :
du 28 avril 2020
au 29 mai 2020
Résumé de la proposition
This proposal is for a new Environmental Compliance Approval for a new stormwater management facility serving 1863406 Ontario Inc. (o/a Cherry Creek Greenhouses), located at 3530 Cherry Avenue, Lincoln, Ontario.
Détails de l'emplacement
Adresse du site
3530 Cherry Avenue
Lincoln,
ON
L0R 2C0
Canada
Détails de l'emplacement du site
Lot 5, Concession 7
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
1863406 Ontario Inc.
Post Office Box 241
Lincoln,
ON
L0R 1B0
Canada
Pourquoi une consultation n’est pas nécessaire
On April 1, 2020, the Ontario Government made a temporary regulation to respond to the COVID-19 outbreak. Ontario Regulation 115/20 exempts all proposals for policies, acts, regulations and instruments from posting requirements under the EBR until 30 days after the declared emergency is terminated.
Détails de la proposition
This proposal is for a new Environmental Compliance Approval for a new stormwater management facility serving 1863406 Ontario Inc. (o/a Cherry Creek Greenhouses), located at 3530 Cherry Avenue, Lincoln, Ontario.
The stormwater management facility is designed to manage roof water from the agricultural greenhouse and includes three existing freshwater storage silos (2,838 cubic metres total), a cistern (150 cubic metres), and ultimately a pond (19,192 cubic metres) that can overflow to Gavora ditch to the west side of the property. Future additions include 6 more freshwater storage silos (5,676 cubic metres), and two cisterns (946 and 758 cubic metres) that will also be directed to the pond.
The final receiver of the discharge from the cistern is Lake Ontario, and it is not expected to be impacted by the effluent discharged from the site.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Commentaire
La consultation est maintenant terminée.
La période de consultation a eu lieu du 28 avril 2020
au 29 mai 2020