Tricol Developments Limited - Environmental Compliance Approval (sewage)

La traduction française de cet avis n'est pas disponible. Nous nous excusons pour le dérangement.

Type d'acte: Environmental Compliance Approval (sewage)

Numéro du REO
019-1809
Numéro de référence du ministère
8878-BDZR9B
Type d'avis
Instrument
Loi
Environmental Protection Act, R.S.O. 1990
Affiché par
Ministry of the Environment, Conservation and Parks
Étape de l'avis
Proposition Mis à jour
Proposition affichée
Période de consultation
Du 22 mai 2020 au 6 juillet 2020 (45 jours) Fermé
Dernière mise à jour

Il n’existe aucune obligation d’afficher cet avis sur le Registre environnemental de l’Ontario, mais nous voulons connaître votre opinion. Soumettez un commentaire et donnez-nous votre avis. Pour en savoir davantage sur le processus de consultation et les types d’avis publiés sur le registre.

Update Announcement

A decision for this proposal has been published as a Bulletin under ERO 019-4024 on July 16, 2021.

Cette consultation a eu lieu :

du 22 mai 2020
au 6 juillet 2020

Résumé de la proposition

This proposal is for a new Environmental Compliance Approval (Industrial Sewage) for Tricol Developments Limited for the use of existing storm and sanitary sewer infrastructure and stormwater management works, in the City of Vaughan, Ontario.

Détails de l'emplacement

Adresse du site

99 Great Gulf Drive
Vaughan, ON
L4K 5W1
Canada

Carte de l'emplacement du site

L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.

Afficher cet emplacement sur une carte opens link in a new window

Promoteur(s)

Tricol Developments Limited
1155 Barmac Drive, Unit 1A
Toronto, ON
M9L 1X4
Canada

Pourquoi une consultation n’est pas nécessaire

On April 1, 2020, the Ontario Government made a temporary regulation to respond to the COVID-19 outbreak. Ontario Regulation 115/20 exempts all proposals for policies, acts, regulations and instruments from posting requirements under the EBR until 30 days after the declared emergency is terminated.

Détails de la proposition

This proposal is for a new Environmental Compliance Approval (Industrial Sewage) for Tricol Developments Limited.

This application is for the use of existing storm and sanitary sewer infrastructure located along the frontage within the property at 123 Great Gulf Drive, in the City of Vaughan, Ontario. This existing private infrastructure is connected to the municipal sewer on Great Gulf Drive and has been extended northwesterly to service the property at 99 Great Gulf Drive, in the City of Vaughan, Ontario.

This application is also for stormwater management works located at 99 Great Gulf Drive, comprising of an infiltration trench facility for stormwater volume reduction and surface storage detention for water quantity control, and will discharge to the private storm sewer on 123 Great Gulf Drive.

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

Commentaire

La consultation est maintenant terminée.

La période de consultation a eu lieu du 22 mai 2020
au 6 juillet 2020

Communiquer avec nous

Contact

S'inscrire pour obtenir des avis

Nous vous enverrons des avis par courriel accompagnés de toute mise à jour liée à cette consultation. Vous pouvez modifier vos préférences relatives à l'avis en tout temps en allant à votre page de profil où se trouvent vos paramètres.

Suivre cet avis