Il n’existe aucune obligation d’afficher cet avis sur le Registre environnemental de l’Ontario, mais nous voulons connaître votre opinion. Soumettez un commentaire et donnez-nous votre avis. Pour en savoir davantage sur le processus de consultation et les types d’avis publiés sur le registre.
Update Announcement
A decision for this proposal has been published as a Bulletin under ERO 019-4024 on July 16, 2021.
Cette consultation a eu lieu :
du 22 mai 2020
au 6 juillet 2020
Résumé de la proposition
This proposal is for a new Environmental Compliance Approval (Industrial Sewage) for Tricol Developments Limited for the use of existing storm and sanitary sewer infrastructure and stormwater management works, in the City of Vaughan, Ontario.
Détails de l'emplacement
Adresse du site
99 Great Gulf Drive
Vaughan,
ON
L4K 5W1
Canada
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
Tricol Developments Limited
1155 Barmac Drive, Unit 1A
Toronto,
ON
M9L 1X4
Canada
Pourquoi une consultation n’est pas nécessaire
On April 1, 2020, the Ontario Government made a temporary regulation to respond to the COVID-19 outbreak. Ontario Regulation 115/20 exempts all proposals for policies, acts, regulations and instruments from posting requirements under the EBR until 30 days after the declared emergency is terminated.
Détails de la proposition
This proposal is for a new Environmental Compliance Approval (Industrial Sewage) for Tricol Developments Limited.
This application is for the use of existing storm and sanitary sewer infrastructure located along the frontage within the property at 123 Great Gulf Drive, in the City of Vaughan, Ontario. This existing private infrastructure is connected to the municipal sewer on Great Gulf Drive and has been extended northwesterly to service the property at 99 Great Gulf Drive, in the City of Vaughan, Ontario.
This application is also for stormwater management works located at 99 Great Gulf Drive, comprising of an infiltration trench facility for stormwater volume reduction and surface storage detention for water quantity control, and will discharge to the private storm sewer on 123 Great Gulf Drive.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Commentaire
La consultation est maintenant terminée.
La période de consultation a eu lieu du 22 mai 2020
au 6 juillet 2020