Il n’existe aucune obligation d’afficher cet avis sur le Registre environnemental de l’Ontario, mais nous voulons connaître votre opinion. Soumettez un commentaire et donnez-nous votre avis. Pour en savoir davantage sur le processus de consultation et les types d’avis publiés sur le registre.
Update Announcement
A decision for this proposal has been published as a Bulletin under ERO 019-2181 on August 5, 2020.
Cette consultation a eu lieu :
du 3 juin 2020
au 18 juillet 2020
Résumé de la proposition
This proposal is for a new Environmental Compliance Approval (Sewage) to be issued to Haylock Farm Ltd., in support of a proposed residential development located on a land municipally known as 133 South River Road (described as part of Broken Front Lot 4, Southeast Side of River; Reference Plan 61R-2640), in the Township of Centre Wellington.
Détails de l'emplacement
Adresse du site
133 South River Road
Centre Wellington,
ON
N0B 1S0
Canada
Détails de l'emplacement du site
Haylock Subdivision, Part of Lot 4, Broken Front 4, Plan 61R-2640
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
Haylock Farm Ltd.
7 Edinburgh Road South
Unit 1
Guelph,
ON
N1H 5N8
Canada
Pourquoi une consultation n’est pas nécessaire
On April 1, 2020, the Ontario Government made a temporary regulation to respond to the COVID-19 outbreak. Ontario Regulation 115/20 exempts all proposals for policies, acts, regulations and instruments from posting requirements under the EBR until 30 days after the declared emergency is terminated.
Détails de la proposition
This proposal is for a new Environmental Compliance Approval (Sewage) to be issued to Haylock Farm Ltd., in support of a proposed residential development located on a land legally described as part of Broken Front Lot 4, Southeast Side of River (municipally known as 133 South River Road), Reference Plan 61R-2640, in the Township of Centre Wellington, Ontario.
The sewage works consists of storm sewers for the collection, transmission and disposal of stormwater run-off from the site; discharging within the into the Grand River.
The proposed sanitary sewers will convey flows to the existing system on Haylock Avenue.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Commentaire
La consultation est maintenant terminée.
La période de consultation a eu lieu du 3 juin 2020
au 18 juillet 2020