Update Announcement
"This notice was initially published on January 24, 2022 with a 45-day public comment period ending March 10, 2022. The proposal was updated with a revised proposal on July 08, 2025 with a 45-day comment period ending August 22, 2025. Due to public interest, the ministry has extended the comment period for and additional 23 days. The comment period now ends on September 12, 2025"
Cette consultation se termine à 23 h 59 le :
22 août 2025
Résumé de la proposition
This proposal is to amend Environmental Compliance Approval No. 1688-8HZNJG for a leachate collection and disposal facility and stormwater management facility to service the Richmond Landfill site, located at 1271 Beechwood Road in the Town of Greater Napanee, County of Lennox and Addington, Ontario.
Détails de l'emplacement
Adresse du site
1271 Beechwood Road
Greater Napanee,
ON
Canada
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
Waste Management of Canada Corporation
1271 Beechwood Road
Napanee,
ON
K7R 3L1
Canada
Détails de la proposition
This proposal is to amend the existing Environmental Compliance Approval (ECA) No. 1688-8HZNJG issued on January 10, 2012, for approval of leachate collection and disposal facility and stormwater management facility to service the Richmond Landfill site located at 1271 Beechwood Road in the Town of Greater Napanee, County of Lennox and Addington.
This amendment application is for approval of the proposed Hydraulic Control System designed to control low concentration leachate impacted groundwater migrating from the site and modifications to the existing Stormwater Management Pond No. three.
The proposed Hydraulic Control System consists of:
- Three groundwater extraction wells open in the intermediate bedrock flow zone.
- One Granular Activated Carbon (GAC) treatment system designed for pre-treatment of the groundwater pumped from the extraction wells.
- Discharge piping to the existing Stormwater Pond No. three; and
- Controls and monitoring including water levels in each extraction well and measurement of cumulative groundwater extraction rate.
The proposed modifications to the existing Stormwater Management Pond No. three consist of:
- One 50 millimetres diameter inlet pipe collecting up to 0.13 litres/second of treated groundwater discharged from the proposed Granular Activated Carbon (GAC) treatment system; and
- One aerator installed in the deepest portion of the pond.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Commentaire
Dites-nous ce que vous pensez de notre proposition.
Vous avez des questions? Contactez la personne-ressource indiquée ci-dessous. Veuillez indiquer le numéro du REO de l’avis dans votre courriel ou votre lettre à la personne-ressource.Lire nos politiques relatives aux commentaires et à la protection de la vie privée.
Soumettre en ligne
Soumettre par la poste
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto, ON
M4V 1P5
Canada