Waste Management of Canada Corporation - Environmental Compliance Approval (sewage)

La traduction française de cet avis n'est pas disponible. Nous nous excusons pour le dérangement.

Type d'acte: Environmental Compliance Approval (sewage)

Numéro du REO
019-4955
Numéro de référence du ministère
4205-CAFSYS
Type d'avis
Instrument
Loi
Environmental Protection Act, R.S.O. 1990
Affiché par
Ministry of the Environment, Conservation and Parks
Étape de l'avis
Proposition Mis à jour
Proposition affichée
Période de consultation
Du 8 juillet 2025 au 22 août 2025 (45 jours) Ouvert
Dernière mise à jour

Update Announcement

"This notice was initially published on January 24, 2022 with a 45-day public comment period ending March 10, 2022. The proposal was updated with a revised proposal on July 08, 2025 with a 45-day comment period ending August 22, 2025. Due to public interest, the ministry has extended the comment period for and additional 23 days. The comment period now ends on September 12, 2025"

Cette consultation se termine à 23 h 59 le :
22 août 2025

Résumé de la proposition

This proposal is to amend Environmental Compliance Approval No. 1688-8HZNJG for a leachate collection and disposal facility and stormwater management facility to service the Richmond Landfill site, located at 1271 Beechwood Road in the Town of Greater Napanee, County of Lennox and Addington, Ontario.

Détails de l'emplacement

Adresse du site

1271 Beechwood Road
Greater Napanee, ON
Canada

Carte de l'emplacement du site

L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.

Afficher cet emplacement sur une carte opens link in a new window

Promoteur(s)

Waste Management of Canada Corporation
1271 Beechwood Road
Napanee, ON
K7R 3L1
Canada

Détails de la proposition

This proposal is to amend the existing Environmental Compliance Approval (ECA) No. 1688-8HZNJG issued on January 10, 2012, for approval of leachate collection and disposal facility and stormwater management facility to service the Richmond Landfill site located at 1271 Beechwood Road in the Town of Greater Napanee, County of Lennox and Addington.

This amendment application is for approval of the proposed Hydraulic Control System designed to control low concentration leachate impacted groundwater migrating from the site and modifications to the existing Stormwater Management Pond No. three.

The proposed Hydraulic Control System consists of:

  1. Three groundwater extraction wells open in the intermediate bedrock flow zone.
  2. One Granular Activated Carbon (GAC) treatment system designed for pre-treatment of the groundwater pumped from the extraction wells.
  3. Discharge piping to the existing Stormwater Pond No. three; and
  4. Controls and monitoring including water levels in each extraction well and measurement of cumulative groundwater extraction rate.

The proposed modifications to the existing Stormwater Management Pond No. three consist of:

  1. One 50 millimetres diameter inlet pipe collecting up to 0.13 litres/second of treated groundwater discharged from the proposed Granular Activated Carbon (GAC) treatment system; and
  2. One aerator installed in the deepest portion of the pond.

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

Commentaire

Dites-nous ce que vous pensez de notre proposition.

Vous avez des questions? Contactez la personne-ressource indiquée ci-dessous. Veuillez indiquer le numéro du REO de l’avis dans votre courriel ou votre lettre à la personne-ressource.

Lire nos politiques relatives aux commentaires et à la protection de la vie privée.

Soumettre en ligne

Soumettre par la poste

Contact

Communiquer avec nous

Contact

S'inscrire pour obtenir des avis

Nous vous enverrons des avis par courriel accompagnés de toute mise à jour liée à cette consultation. Vous pouvez modifier vos préférences relatives à l'avis en tout temps en allant à votre page de profil où se trouvent vos paramètres.

Suivre cet avis