Il n’existe aucune obligation d’afficher cet avis sur le Registre environnemental de l’Ontario, mais nous voulons connaître votre opinion. Nous vous remercions de vos commentaires.
Cette consultation a eu lieu :
du 1 avril 2022
au 1 mai 2022
Résumé de la décision
An Environmental Compliance Approval with Limited Operational Flexibility (air & noise) has been issued to Greenstone Gold Mines GP Inc., located in Greenstone, Ontario. The facility undertakes gold ore mining and milling.
Détails de l'emplacement
Adresse du site
8000 Highway 11
Geraldton,
ON
P0T 1M0
Canada
Détails de l'emplacement du site
The property is located approximately 275 kilometers northeast of the city of Thunder Bay and approximately 4 kilometers south of the town of Geraldton, at the intersection of Provincial Highway 584 and Trans-Canada Highway 11.
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
Greenstone Gold Mines GP Inc.
2381 Bristol Circle
Unit B203
Oakville,
ON
L5H 5S9
Canada
Détails de la décision
An Environmental Compliance Approval with Limited Operational Flexibility (air & noise) has been issued to Greenstone Gold Mines GP Inc., located in Greenstone, Ontario. The facility undertakes gold ore mining and milling.
This approval replaces all the current Environmental Compliance Approvals for air and noise at this facility and includes the addition of new, or historically unapproved, sources of emissions.
This approval includes all sources at the facility, including:
- aggregate extraction and processing
- open pit development and mining (blasting, drilling, ore/mine rock extraction and material handling)
- ore, mine rock and overburden handling, crushing and stockpiling
- ore processing (crushing, milling, cyanide leaching, carbon-in-pulp processing, carbon stripping, electrowinning, gold dore bar production and carbon regeneration)
- tailings management and treatment
- fuel storage
- maintenance facilities
- an explosives plant
- a concrete batch plant
- mine water and sewage treatment
- natural gas fired power generation
- haul roadways
Emissions to the air from this facility include:
- particulate matter including crystalline silica
- metals including chromium, aluminum and nickel
- products of combustion such as nitrogen oxides and sulphur dioxide
The Environmental Compliance Approval with Limited Operational Flexibility (air), when issued, permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (air).
The limited operational flexibility conditions have an expiry date. The company will be required to make an application for amendment at that time to renew these conditions.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
435 James Street South
3rd Floor, Suite 331B
Thunder Bay,
ON
P7E 6S7
Canada
135 St. Clair Avenue West
Floor 1
Toronto,
ON
M4V 1P5
Canada
How to Appeal
Appeals are not allowed
The issuance of this Environmental Compliance Approval (Air and Noise) is required to implement an undertaking that was approved under the Environmental Assessment Act. Section 32 of the Environmental Bill of Rights exempts these types of proposals for instruments from notice requirements under the Environmental Bill of Rights.
Communiquer avec nous
Contact
Brian Ramasir
1st Flr, 135 St Clair Ave W
Toronto,
ON
M4V 1P5
Canada
Proposition initiale
Pourquoi une consultation n’est pas nécessaire
The issuance of this Environmental Compliance Approval (Air and Noise) is required to implement an undertaking that was approved under the Environmental Assessment Act. Section 32 of the Environmental Bill of Rights exempts these types of proposals for instruments from notice requirements under the Environmental Bill of Rights.
We are voluntarily seeking feedback on this proposal. There is no public leave to appeal on the decision.
Détails de la proposition
This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (Air and Noise), which replaces all the current Environmental Compliance Approvals for Air and Noise at this facility, and includes the addition of new, or historically unapproved sources of emissions from Greenstone Gold Mines GP Inc., an open pit gold mine and processing facility located in Geraldton, Ontario.
The proposal includes all sources at the facility, including:
- an open pit
- ore processing operations including crushing, blasting, and drilling
- ore processing plants
- waste rock storage areas
- ore and overburden stockpiles
- a lime storage silo
- furnaces
- kilns
- chemical storage tanks
- a portable crusher
- bulldozing and grading operations
- a tailings management facility
- a natural gas-fuelled power plant
- dust collectors
- other ancillary equipment and support processes
Emissions to the air from this facility include:
- particulate matter including crystalline silica
- metals including chromium, aluminum and nickel
- products of combustion such as nitrogen oxides and sulphur dioxide
The Environmental Compliance Approval with Limited Operational Flexibility (Air and Noise), when issued permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (Air and Noise). The limited operational flexibility conditions have an expiry date. The company will be required to make an application for amendment at that time to renew these conditions.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
Commentaire
La consultation est maintenant terminée.
Cette consultation a eu lieu 1 avril 2022
au 1 mai 2022
Communiquer avec nous
Contact
Brian Ramasir
1st Flr, 135 St Clair Ave W
Toronto,
ON
M4V 1P5
Canada
Commentaires reçus
Par l'entremise du registre
0Par courriel
0Par la poste
0