Commentaire
Cutting corners is never a good idea. The already defined process ensures careful consideration is taken to get it right the first time.
If legislation undercuts public input, bypasses steps that are proven to accurately anticipate and be prepared for the unexpected or otherwise short circuit the process by skipping necessary steps, it should not survive final reading in the legislature.
I do not support legislation that subverts democratic process, and introduces the possibility of inferior outcomes for the sake of reckless speed.
Haste makes waste. No shortcuts please. Take the time for things to be done right
Soumis le 26 janvier 2024 6:31 PM
Commentaire sur
Modifications proposées aux exigences relatives à l’autorisation de construire de la Loi de 1998 sur la Commission de l’énergie de l’Ontario pour soutenir l’électrification et la construction de logements et de transports en commun
Numéro du REO
019-8070
Identifiant (ID) du commentaire
95875
Commentaire fait au nom
Statut du commentaire