Commentaire
Please require a full EA for this proposal. You have received 1000s of comments already with all the concrete evidence on why this should require a Full EA. This site is less than 1km from our town and affects our drinking water, wildlife, water wells, and our health. If it was proposed as a new site and not trying to use/revise old licenses, it would require a full EA based on the location to a town being less than 3.5km.
Our first choice as a community would for you to reject all the proposals from York 1 for this site. Second choice is a full EA to start.
Save our health, town, infrastructure, wildlife and water!
Soumis le 28 avril 2024 8:57 AM
Commentaire sur
Proposition de désignation, en vertu de la Loi sur les évaluations environnementales, du site d’enfouissement et de l’expansion du transfert et du traitement des déchets, situés dans la municipalité de Chatham Kent
Numéro du REO
019-8417
Identifiant (ID) du commentaire
98393
Commentaire fait au nom
Statut du commentaire