This application is for a new Environmental Compliance Approval (ECA) for Draglam Waste and Recycling Inc. for management of stormwater at 225 Artesian Industrial Parkway, Bradford, and to satisfy Condition 16 of ECA No. 1194-DGHNWE, which was granted to operate a dry non-hazardous waste transfer station on the site.
This proposal is to amend the Environmental Compliance Approval (air & noise) No. 8-6025-98-007 for Aevitas Inc., a facility that processes, stores and transfers PCB, hazardous & liquid industrial wastes, industrial metal wastes and non-hazardous solid materials, located in the Town of Kirkland Lake, Ontario.
This proposal is for the renewal of the Limited Operational Flexibility for an Environmental Compliance Approval (air & noise) No. 3044-A2WMPJ for AOC Resins and Coatings Company, a facility that produces polyester resins, gelcoats, and associated resins, located in the City of Guelph, Ontario.
The proposal is for a new Environmental Compliance Approval for industrial sewage treatment and stormwater management works serving highline Produce Limited located at 506 Mersea Road 5, in Leamington.
This proposal is for the renewal of the Limited Operational Flexibility for an Environmental Compliance Approval (air & noise) No. 1600-9LKJLP for BWXT Nuclear Energy Canada Inc., a manufacturing facility of zirconium fuel tubes and products for nuclear power located in Arnprior, Ontario.
November 12, 2025 - December 27, 2025 (45 days) Closed
Last updated
An amended Environmental Compliance Approval has been issued for sewage work for Cedar Crest Campground, located 120 Varty Lake Road, Township of Stone Mills, County of Lennox and Addington.
October 9, 2025 - November 23, 2025 (45 days) Closed
Last updated
A new Environmental Compliance Approval (air & noise) for Gateway Services Inc. for the operation of a pet crematorium facility, located in the City of St. Thomas, Ontario.
September 24, 2025 - November 8, 2025 (45 days) Closed
Last updated
An amended Environmental Compliance Approval (ECA) has been issued, permitting stormwater management works to service the Stoney Creek Regional Facility located at 65 Green Mountain Road West in the City of Hamilton.
October 27, 2025 - December 11, 2025 (45 days) Closed
Last updated
An amendment was approved to existing Environmental Compliance Approval No. 1431-BTWRCL issued on October 22, 2020 for 102 Main Street. The purpose of this amendment is to request a change from the previously approved Norweco Modulair CR-90 treatment plant treating wastewater from the facility at 106 Main Street with five Ecoflo units.
Instrument type:
Issuance of a licence to remove over 20,000 tonnes of aggregate annually from a pit or a quarry
ERO number
019-7805
Notice type
Instrument
Notice stage
Decision
Decision posted
Proposal posted
Comment period
November 16, 2023 - January 15, 2024 (60 days) Closed
Last updated
Rejean Jolette applied for a licence to operate a pit above the water table in Nipissing District, the License application was transferred to Françoise Raymond and the license was issued to extract aggregate from a pit in Nipissing District.
Instrument type:
Changes to the site plan for a pit or quarry
ERO number
025-1422
Notice type
Instrument
Notice stage
Proposal
Proposal posted
Comment period
January 30, 2026 - March 31, 2026 (60 days) Open
Last updated
Amrize Canada Inc. (formerly Lafarge Canada Inc.) seeks to extract below the water table in a portion of the northern setback, which is adjacent to land owned by Amrize. Lafarge Canada Inc. underwent a corporate name change in June 2025 to Amrize Canada Inc.
Instrument type:
Changes to the site plan for a pit or quarry
ERO number
026-0040
Notice type
Instrument
Notice stage
Proposal
Proposal posted
Comment period
January 29, 2026 - March 2, 2026 (32 days) Open
Last updated
R.W. Tomlinson Limited seeks to authorize an amendment the current site plan to lower the depth of extraction across the site and to remove references on the site plan related to the municipal road allowance.
The Director of Exploration has made a decision on the exploration permit application PR-23-000170 to Metals Creek Resources for early exploration activities.
The decision is to: issue the mineral exploration permit.
This proposal is for a new Environmental Compliance Approval (waste disposal site) for 101172801 Saskatchewan Ltd. (Trirock Construction Limited), the operator of the soil processing facility located at 5878 Highway 9 in Schomberg, New Tecumseth, County of Simcoe, Ontario.
This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (air and noise) which replaces all the current Environmental Compliance Approvals for Air and Noise at this facility and includes the addition of new or historically unapproved sources for all emissions from King Paving & Construction Ltd.
This proposal is for a new Environmental Compliance Approval (sewage) as part of a proposed trailer park expansion of on-site sewage systems serving A.W. Campbell Conservation Area located at 8477 Shiloh Line, in Alvinston, in the Municipality of Brooke-Alvinston, Ontario.
This proposal is for the renewal of the Limited Operational Flexibility for an Environmental Compliance Approval (air & noise) No. 0272-A8CHKA for Virox Technologies Inc., a manufacturer of hydrogen peroxide-based cleaning and disinfection products operates a facility located in the Town of Oakville, Ontario.
This proposal is for an Environmental Compliance Approval (waste disposal site) with the Operational Flexibility for a non-hazardous solid waste transfer facility. The total site area is 2.29 hectares, and the proposed transfer station building would be approximately 1,300 square metres property located at 779 Powerline Road, Brantford, Ontario.
January 29, 2026 - February 28, 2026 (30 days) Open
Last updated
This proposal is for a renewal to Permit To Take Water No.1230-A8TJHP for Watch Tower Bible and Tract Society of Canada for irrigation, water supply and cooling water purposes. Water will be taken from four wells in Halton Hills, Ontario.