This Permit to Take Water is being issued for operations associated with the Hardrock Project, for which public consultation on this alternative was previously conducted under an Individual Environmental Assessment (EA Reference No. 14175; File No. EA-02-10).
An amended Environmental Compliance Approval with Limited Operational Flexibility has been granted to Greenfield Global Inc., a fuel-grade ethanol and very-high-quality (VHQ) potable alcohol manufacturing facility located in the Township of Edwardsburgh/Cardinal, Ontario.
We issued an amended Environmental Compliance Approval No. A210742 for the use and operation of a waste disposal site (processing/transfer) and Class 1 soil management site for management of excess soil limited to dry soil.
The Ministry of Infrastructure (MOI) will be proposing a new Statement of Environmental Values (SEV) in order to reflect the changes in its structure and mandate, as well as to acknowledge the priority of addressing climate change. Given the changes, this proposal is no longer being considered.
Approval is granted to amend the existing Environmental Compliance Approval (waste transfer) No. A620099 for receiving and temporary storage of hauled sewage in addition to the storage of processed organic waste (biosolids) to be collected from Southwestern Ontario.
The Director of Exploration has made a decision on the exploration permit application PR-20-000113 by John Brady for early exploration activities 40 kilometres north of City of Greater Sudbury, Ontario, in Parkin Township
We have received notices of material change for Vale Canada Limited Ontario Operations that will result in Vale Canada Limited submitting 16 closure plan amendments.
MTO has updated its Statement of Environmental Values (SEV) to reflect the ministry’s current vision, mandate and business, and to strengthen the priority of addressing climate change.
October 26, 2022 - December 10, 2022 (45 days) Closed
Last updated
On March 19, 2024, we issued a new Environmental Compliance Approval (ECA) to Titan Transfer Inc. for a solid non-hazardous waste transfer station. The site is located at 2258 River Rd. in the City of London, Ontario.
January 27, 2020 - March 12, 2020 (45 days) Closed
Last updated
We have amended the Environmental Compliance Approval (air & noise) No. 3056-7T9QDR for Aecon Construction Ontario East Limited, a quarry and batch mix asphalt plant located in Ottawa, Ontario.
November 8, 2021 - December 8, 2021 (30 days) Closed
Last updated
A new Permit to Take Water No. 2874-CB9QZZ for Lafarge Canada Inc. was issued on February 16, 2022 for construction dewatering purposes in the City of Hamilton, Ontario.
An Environmental Compliance Approval (waste disposal site) was issued to an enclosed non-hazardous materials processing facility. This facility is on a 4.7 hectares property located in the City of Kingston, Ontario.
December 10, 2025 - January 24, 2026 (45 days) Closed
Last updated
This proposal is for an amendment to the Limited Operational Flexibility for an Environmental Compliance Approval (air & noise) No. 5542-AYKJ4H for Canadian Babbitt Bearings Ltd., a ferrous and non-ferrous foundry that specializes in manufacturing castings, located in the City of Niagara Falls, Ontario.
Ontario’s Strategy to Address the Threat of Invasive Wild Pigs has been finalized. The strategy outlines a proactive approach to prevent the establishment of invasive wild pigs in the province.
Instrument type:
Permit for activities to achieve an overall benefit to a species
ERO number
019-2504
Notice type
Instrument
Notice stage
Decision
Decision posted
Proposal posted
Comment period
October 2, 2020 - November 1, 2020 (30 days) Closed
Last updated
The minister has issued an overall benefit permit to Boblo South Development Inc. for the development of a residential subdivision that may impact Butler’s Gartersnake and Eastern Foxsnake, which are species at risk. The permit includes actions to benefit both species, minimize adverse effects, and outlines monitoring and reporting requirements.
November 21, 2024 - January 5, 2025 (45 days) Closed
Last updated
An amended Environmental Compliance Approval has been issued to QM GP Inc., as general partner for and on behalf of QM LP, for one mobile in-situ remediation system to be used throughout Ontario.