Gowest Gold Limited has submitted transmittal and certification replacement pages and a revised Financial Assurance table as an amendment to its Closure Plan for Advanced Exploration – Bradshaw Project of August 7, 2015.
Instrument type:
Approval for variance from the Liquid Fuels Handling Code
ERO number
019-1748
Notice type
Instrument
Notice stage
Proposal
Proposal posted
Comment period
May 4, 2020 - June 3, 2020 (30 days) Closed
Last updated
The applicant wants to replace several tank and dispenser sump entry boots (fittings that connect piping to a containment system) with retrofit boots made by Icon Products.
October 8, 2019 - November 22, 2019 (45 days) Closed
Last updated
Approval has been granted for an amendment to the Limited Operational Flexibility for an Environmental Compliance Approval (Air & Noise) No. 9194-92YJPR for Index Energy Ajax Corporation, a facility producing steam for industrial use and electricity for export to the grid, located in the Town of Ajax, Ontario.
Approval has been granted for an amendment to Environmental Compliance Approval (Air & Noise) No.7419-94HSFT with Limited Operational Flexibility for Irving Consumer Products Limited, a tissue manufacturing facility located in the City of Toronto, Ontario.
Approval has been granted for an amendment to the Limited Operational Flexibility for an Environmental Compliance Approval (Air & Noise) No. 2613-A66RB9, for all emissions from Morgan-Multivans Canada Corporation, a truck body manufacturing facility located in Bolton, Ontario.
October 31, 2019 - December 15, 2019 (45 days) Closed
Last updated
We have approved a new Environmental Compliance Approval for Irving Oil Limited for the establishment of stormwater management works in Cornwall, Ontario.
Instrument type:
Approval for variance from the Liquid Fuels Handling Code
ERO number
019-1742
Notice type
Instrument
Notice stage
Proposal
Proposal posted
Comment period
May 1, 2020 - May 31, 2020 (30 days) Closed
Last updated
2723579 ONTARIO INC. O/A CLARINGTON ESSO wants to leave two unused double-wall fibre-reinforced plastic underground tanks in the ground and to bring them back into service.
December 24, 2019 - February 7, 2020 (45 days) Closed
Last updated
A new Environmental Compliance Approval (ECA) for stormwater management works serving Hayshore Estates Subdivision was issued to Hay Family Development Inc. in the Township of Beckwith.
November 29, 2019 - December 30, 2019 (31 days) Closed
Last updated
A new Environmental Compliance Approval is granted to CosMic Plants Inc. for existing stormwater management facility serving the existing greenhouse site located at 4228 Maple Grove Road, in the town of Lincoln.
February 12, 2020 - March 28, 2020 (45 days) Closed
Last updated
An Environmental Compliance Approval (Sewage Works) was granted for the establishment of a seasonal subsurface sewage disposal works to service a proposed cottage located in the Township of Mapleton, Ontario.
Instrument type:
Approval for a consent (subject to conditions) in an area where there is no official plan in place
ERO number
019-1275
Notice type
Instrument
Notice stage
DecisionUpdated
Decision posted
Proposal posted
Comment period
February 5, 2020 - March 6, 2020 (30 days) Closed
Last updated
Application 60-C-203262 for a lot addition was approved on March 20, 2020 with conditions. Applicant has one (1) year to satisfy conditions otherwise approval will lapse.
October 9, 2019 - November 23, 2019 (45 days) Closed
Last updated
A new Environmental Compliance Approval (Industrial Sewage) has been granted for Shell Canada Limited/Shell Canada Limitee to service a gas bar located at 2130 Morningside Avenue in the City of Toronto, Ontario.
The application for an amended Environmental Compliance Approval (ECA) has been withdrawn by Coco Paving Inc. for a hot-mix asphalt plant located in the City of Kingston, Ontario.
Instrument type:
Approval for variance from the Liquid Fuels Handling Code
ERO number
019-1720
Notice type
Instrument
Notice stage
Proposal
Proposal posted
Comment period
April 29, 2020 - May 29, 2020 (30 days) Closed
Last updated
Reach Harbour Marina wants to continue to use two single-wall steel underground storage tanks, located approximately one metre from Lower Buckhorn Lake, for two more years during the “on-season” (approximately May to October), and then remove them from the ground.
We finalized the recovery strategy for Yellow-breasted Chat. The Government of Ontario is seeking input on the species-specific policy (government response statement) through a survey that closes May 25, 2020.
The Director of Exploration has made a decision on the exploration permit application PR-20-000092 to Pavey Ark Minerals Incorporated for early exploration activities near Elliot Lake, Ontario. The decision is to: Issue the permit.
September 11, 2019 - October 26, 2019 (45 days) Closed
Last updated
We issued an Amended Environmental Compliance Approval with limited operational flexibility to Motor Coils Mfg. Ltd., a rail car components (motor coils) manufacturing facility located in the City of Brockville, Ontario.
September 23, 2019 - November 7, 2019 (45 days) Closed
Last updated
An Environmental Compliance Approval (Air & Noise) has been granted to Starlim North America Corporation, a manufacturer of tools and shape-molded parts from silicone and multi-material parts using an injection-molding process, located in the City of London, Middlesex County.