Instrument type:
Changes to the site plan for a pit or quarry
ERO number
019-8716
Notice type
Instrument
Notice stage
Decision
Decision posted
Proposal posted
Comment period
May 29, 2024 - June 28, 2024 (30 days) Closed
Last updated
Approval was granted for a site plan amendment to QBJR Aggregates Inc. to amend the current site plan for the importation of excess soils to facilitate modifications to the final rehabilitated landform.
January 5, 2024 - February 19, 2024 (45 days) Closed
Last updated
This approval is for an Environmental Compliance Approval (industrial sewage) to be issued to Tigercat International Inc. for the construction of a stormwater management works structure, including storm sewers and stormwater management system; all designed to provide quality and quantity control,in support of a proposed industrial site development.
August 13, 2025 - September 27, 2025 (45 days) Closed
Last updated
Certificate of Property Use No.3865-DHTLVU for 175 & 185 Eileen Avenue, Toronto, Ontario, was issued to owners as part of their development plans for the site.
This proposal for an amendment to Environmental Compliance Approval No. 6747-8X9QZW for GeoSource Energy Inc. an installer of vertical closed loop geothermal systems, was approved on October 29, 2024.
Approval is granted for a new Environmental Compliance Approval for industrial stormwater management works serving the Costco Fuel Facility, located at 87 Harry Walker Parkway South in Newmarket, Ontario.
October 20, 2023 - December 4, 2023 (45 days) Closed
Last updated
Approval is granted for a new Environmental Compliance Approval for stormwater management works serving 1604938 Ontario Inc., located at 100 Hollinger Crescent, in the City of Kitchener, Ontario.
July 28, 2025 - September 11, 2025 (45 days) Closed
Last updated
This proposal for a new multi-site Environmental Compliance Approval (geothermal) for 2681872 Ontario Ltd. to install vertical closed loop ground source heat pumps has been approved.
An Environmental Compliance Approval (Air & Noise - mobile) has been granted to Sanscon Construction Ltd. for the operation of a portable crushing plant throughout the Province of Ontario.
November 5, 2025 - December 20, 2025 (45 days) Open
Last updated
This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (air & noise) from Dana Canada Corporation, a manufacturer of heat exchanger products for the automotive industry and an operator of a ground water remediation system, located in the City of Cambridge, Ontario.
November 5, 2025 - December 20, 2025 (45 days) Open
Last updated
This proposal is for the renewal of Environmental Compliance Approval No. 3466-C7QPF6 for Goulet Septic Pumping and Design Ltd. for a hauled sewage disposal site for surface spreading with a lagoon storage cell and four reed filter beds.
November 5, 2025 - December 20, 2025 (45 days) Open
Last updated
This proposal is for a new Environmental Compliance Approval (sewage) for the establishment of stormwater management facilities owned by Global Waste Disposal London Ltd. for the collection, transmission, treatment and disposal of stormwater run-off from a site located at 2040 River Road, in the City of London, Ontario.
The Permit to Take Water No. P-300-2188227260 version 2.0 was issued to R. W. Tomlinson Limited on November 3, 2025, to renew the Permit No. P-300-2188227260 version 1.0. Water will be taken from two lake sources for the purposes of dust suppression and aggregate washing, located in Bruce Mines, Ontario.
Instrument type:
Approval of a municipality’s official plan
ERO number
025-1206
Notice type
Instrument
Notice stage
Proposal
Proposal posted
Comment period
November 4, 2025 - December 4, 2025 (30 days) Open
Last updated
The Ministry of Municipal Affairs and Housing has received a proposed official plan from the Municipality of Magnetawan for a decision. The purpose of the proposed plan is to achieve consistency with provincial policies, and to establish goals, objectives, and local policies to manage and direct physical (land use) change within the municipality.
November 4, 2025 - December 19, 2025 (45 days) Open
Last updated
This proposal is for a new Environmental Compliance Approval (air & noise) for CBM Ready Mix for the operation of three ready-mix concrete batching plants, located in Bowmanville, Ontario.
The proponent has informed the ministry that they have decided to withdraw their Environmental Compliance Approval application for this proposal. Should the proponent wish to re-apply, the ministry will continue to ensure the protection of the health and safety of the environment and public in its technical review of the application.
November 4, 2025 - December 19, 2025 (45 days) Open
Last updated
This proposal is for a new Environmental Compliance Approval (sewage) for the construction of a spill containment and treatment system serving a truck fueling island, as part of the proposed Foxton Fuel drainage improvements for the site located at 1425 Yonge Street, Walkerton, in the Municipality of Brockton, Ontario.
Permit to Take Water No. P-300-8348333114 (version 1) has been issued to John Bennett, for golf course irrigation. Water will be taken from one pond and one lake.
August 20, 2025 - October 4, 2025 (45 days) Closed
Last updated
An Environmental Compliance Approval (sewage works) was granted to 401 Elmira Holdings Inc. for the establishment of stormwater management facilities for the development of a commercial/industrial building located at 401 Arthur Street South, Elmira, in the Township of Woolwich, Region of Waterloo, Ontario.