I recommend consideration of the following changes/additions to the routing:
1. Follow Nashville Road from, Objectid 2937, Hwy 50 through Nashville and Kleinburg to Islington, south to Stegman's Mill Road to Bindertwine Park. From Bindertwine Park an existing off road trail exists to Langstaff Road. A connection could then be made to Objectid 2237.
2. Use Hwy 7 as a through route of Vaughan from Brampton to Markham. On road routing is required.
3. Use White Church Road, Fiddler's Green Road, Lovers Lane and Sulphur Springs Road in Ancaster as a connector between Objectid 151 and 1917. These are low volume roads. Fiddler's Green is an existing on-road route.
4. The City of Vaughan has drafted the off-road Super Trail Concept which includes a route along the TransCanada pipeline route north of Kleinburg and Maple. The planned Kleinburg/TransCanda Pipeline Trail segment is a key component of Vaughan's Supertrail and key connector to adjacent Cities. The route is identified as a connector route but consideration should be given to upgrade to a Province-Wide Route status.
[Original Comment ID: 209138]
Soumis le 12 février 2018 2:28 PM
Commentaire sur
Établissement d'un réseau cyclable provincial
Numéro du REO
013-0190
Identifiant (ID) du commentaire
1809
Commentaire fait au nom
Statut du commentaire