2.0 Foundation Drainage…

Numéro du REO

019-4456

Identifiant (ID) du commentaire

58688

Commentaire fait au nom

Individual

Statut du commentaire

Commentaire

2.0 Foundation Drainage Works

If a site is taking and treating less than 50,000 L/day of foundation drainage for discharge to a storm sewer and a PTTW is not required, will an ECA still be required?

4.0 Construction Site Dewatering

I understand that if a PTTW is required for taking and treating construction dewatering for discharge to storm, then the new policy states that an ECA will not be required.

If a site is taking and treating less than 50,000 L/day of construction dewatering to discharge to a storm sewer and an EASR is not required, will an ECA still be required?

If a site is taking and treating between 50,000 L/day and 400,000 L/day of construction dewatering to discharge to a storm sewer and an EASR is required, will an ECA still be required?