Update Announcement
This proposal notice has been updated on April 07, 2026 to advise the public that this application is still under active review. The original proposal date and comment period have not been altered.
Cette consultation a eu lieu :
du 17 juin 2024
au 1 août 2024
Résumé de la décision
A new Environmental Compliance Approval (sewage) has been issued to Innophos Canada, Inc. for their Port Maitland chemical manufacturing facility located at 109 Siddall Road in Lowbanks, Ontario.
Détails de l'emplacement
Adresse du site
109 Siddall Road
Lowbanks,
ON
Canada
Détails de l'emplacement du site
Innophos Port Maitland
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
Innophos Canada, Inc.
109 Siddall Road
Lowbanks,
ON
N0A 1K0
Canada
Détails de la décision
The approved stormwater management works are designed to provide quality and quantity controls through an oil and grit separator, grassed swales, and vegetated filter strips with storm sewers, discharging to Lake Erie via the Grand River.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
119 King Street West
Floor 9
Hamilton,
ON
L8P 4Y7
Canada
How to Appeal
Cet avis de décision peut être porté en appel. Vous avez jusqu’à 15 jours à partir du 2 octobre 2026 pour entamer le processus d’appel.
Veuillez lire les renseignements suivants attentivement pour en savoir plus sur le processus d’appel.
Comment interjeter appelClick to Expand Accordion
Start the process to appeal
If you’re an Ontario resident, you can start the process to appeal this instrument decision.
First, you’ll need to seek leave (i.e. get permission) from the relevant appellate body to appeal the decision.
If the appellate body grants leave, the appeal itself will follow.
Seek leave to appeal
To seek leave to appeal, you need to do these three things:
- prepare your application
- provide notice to the minister
- mail your application to three parties
1. Prepare your application
You’ll need to prepare an application. You may wish to include the following things in your application:
- A document that includes:
- your name, phone number, fax number (if any), and/or email address
- the ERO number and ministry reference number (located on this page)
- a statement about whether you are a resident in Ontario
- your interest in the decision, and any facts you want taken into account in deciding whether you have an interest in the decision
- the parts of the instrument that you’re challenging
- whether the decision could result in significant harm to the environment
- the reason(s) why you believe that no reasonable person – having regard to the relevant law and to any government policies developed to guide decisions of that kind – could have made the decision
- the grounds (facts) you’ll be using to appeal
- the outcome you’d like to see
- A copy of the instrument (approval, permit, order) that you you are seeking leave to appeal. You’ll find this in the decision notice on the Environmental Registry
- Copies of all supporting documents, facts and evidence that you’ll be using to appeal
What is considered
The appeal body will consider the following two questions in deciding whether to grant you leave to appeal:
- is there is good reason to believe that no reasonable person, with respect to the relevant law and to any government policies developed to guide decisions of that kind, could have made the decision?
- could the decision you wish to appeal result in significant harm to the environment?
2. Provide your notice
You’ll need to provide notice to the Minister of the Environment, Conservation and Parks that you’re seeking leave to appeal.
In your notice, please include a brief description of the:
- decision that you wish to appeal
- grounds for granting leave to appeal
You can provide notice by email at minister.mecp@ontario.ca or by mail at:
College Park 5th Floor, 777 Bay St.
Toronto, ON
M7A 2J3
3. Mail your application
You’ll need to mail your application that you prepared in step #1 to each of these three parties:
- appellate body
- issuing authority (the ministry official who issued the instrument)
- proponent (the company or individual to whom the instrument was issued)
Innophos Canada, Inc.
109 Siddall Road
Lowbanks,
ON
N0A 1K0
Canada
Registrar, Ontario Land Tribunal
655 Bay Street, Suite 1500
Toronto, Ontario
M5G 1E5
(416) 212-6349
(866) 448-2248
OLT.Registrar@ontario.ca
Inclure les éléments suivants:
Il ne s'agit pas d'un avis juridique. Veuillez vous reporter à la Charte des droits environnementaux de 1993 pour connaître les exigences exactes prévues par la loi. Consultez un avocat si vous avez besoin d'aide avec le processus d'appel.
Communiquer avec nous
Contact
Client Services and Permissions Branch
40 St. Clair Avenue West
Floor 2
Toronto,
ON
M4V 1M2
Canada
Proposition initiale
Détails de la proposition
This proposal is for a new Environmental Compliance Approval (sewage) with Limited Operational Flexibility (LOF) to be issued to Innophos Canada, Inc. for a stormwater management system, in support of the proposed Port Maitland chemical manufacturing facility located at 109 Siddall Road in Lowbanks, Ontario.
The stormwater management works is designed for quality and quantity control provided through an oil and grit separator, surrounding wetlands, grassed swales, and vegetated filter strips with storm sewers, complete with parking lots and a landscaped perimeter, discharging from the site into Lake Erie via the Grand River.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
40 St. Clair Avenue West
Floor 2
Toronto,
ON
M4V 1M2
Canada
Commentaire
La consultation est maintenant terminée.
Cette consultation a eu lieu 17 juin 2024
au 1 août 2024
Communiquer avec nous
Contact
Client Services and Permissions Branch
40 St. Clair Avenue West
Floor 2
Toronto,
ON
M4V 1M2
Canada
Commentaires reçus
Par l'entremise du registre
0Par courriel
0Par la poste
0