The Jesuit Fathers of Upper Canada Holding Corporation - Environmental Compliance Approval (sewage)

La traduction française de cet avis n'est pas disponible. Nous nous excusons pour le dérangement.

Type d'acte: Environmental Compliance Approval (sewage)

Numéro du REO
026-1031
Numéro de référence du ministère
6653-DWXPGL
Type d'avis
Instrument
Loi
Environmental Protection Act, R.S.O. 1990
Affiché par
Ministry of the Environment, Conservation and Parks
Étape de l'avis
Proposition
Proposition affichée
Période de consultation
Du 13 octobre 2026 au 27 novembre 2026 (45 jours) Ouvert
Dernière mise à jour

Cette consultation se termine à 23 h 59 le :
27 novembre 2026

Résumé de la proposition

This proposal is for an amendment to Environmental Compliance Approval No. 4505-5L2Q44, including the consolidation of sewage works approved under TA-32-91 for the establishment, modification, and consolidation of sewage works servicing Martyrs’ Shrine in Midland, Ontario.

Détails de l'emplacement

Adresse du site

16163 Highway West
Tay, ON
Canada

Détails de l'emplacement du site

Lot 16 and 17, Concession 3

Carte de l'emplacement du site

L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.

Afficher cet emplacement sur une carte opens link in a new window

Promoteur(s)

The Jesuit Fathers of Upper Canada Holding Corporation
16163 Highway 12 West
Tay, ON
L4R 4K5
Canada

Détails de la proposition

This proposal is for an amendment to Environmental Compliance Approval No. 4505-5L2Q44, including the consolidation of sewage works approved under TA-32-91 for the establishment, modification, and consolidation of sewage works servicing Martyrs’ Shrine in Midland, Ontario.

The proposed sewage works will collect, convey, treat, and dispose of domestic sewage generated by existing and proposed facilities throughout the property.

The sewage works will include sanitary collection infrastructure, septic tanks, pumping stations, forcemains, flow equalization facilities, a packaged wastewater treatment plant with phosphorus treatment, and subsurface disposal facilities. Existing sewage works throughout the property will be consolidated under a single Environmental Compliance Approval.

The proposed treatment system has a design capacity of approximately 65,000 litres per day, with flow equalization provided to accommodate variations in sewage generation associated with pilgrimage activities and peak visitation. Estimated sewage flows are approximately 41,275 litres per day during non-pilgrimage periods and up to approximately 121,275 litres per day during peak pilgrimage periods.

Treated effluent will be discharged to an expanded subsurface disposal system for final dispersal into the ground. The proposed upgrades are intended to improve effluent quality and provide adequate treatment and disposal capacity for facilities throughout the property.

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

Client Services and Permissions Branch
Address

40 St. Clair Avenue West
Floor 2
Toronto, ON
M4V 1M2
Canada

Office phone number

Commentaire

Dites-nous ce que vous pensez de notre proposition.

Vous avez des questions? Contactez la personne-ressource indiquée ci-dessous. Veuillez indiquer le numéro du REO de l’avis dans votre courriel ou votre lettre à la personne-ressource.

Lire nos politiques relatives aux commentaires et à la protection de la vie privée.

Soumettre en ligne

Soumettre par la poste

Contact

Communiquer avec nous

Contact

S'inscrire pour obtenir des avis

Nous vous enverrons des avis par courriel accompagnés de toute mise à jour liée à cette consultation. Vous pouvez modifier vos préférences relatives à l'avis en tout temps en allant à votre page de profil où se trouvent vos paramètres.

Suivre cet avis