Commentaire
- Clarification should be considered regarding the term ‘field tile inlet’. As field tiles are comprised of perforated pipes, the entire length of a field tile could be considered an inlet. Or is the intent referring to a ground surface level inlet (Catch Basin, Hickam Bottom, etc)?
- A well required to serve the on-farm worker housing would be required to be located 372.4’ away from the centre of the septic system
- Is it appropriate to push 372.4’ away from all property lines, as this has the potential of pushing the on-farm worker housing into cultivatable land?
- If a on-farm worker housing building is re-purposed to another use, what does that mean for the septic system?
- As this proposal only impacts 300 properties within the entire Province of Ontario, would it be more appropriate to increase the daily design limitation in Part 8 to 20,000L/day for all properties, as this will permit more rural properties to have multiple Accessory Residential Units (where permitted) as well include some of the smaller on-farm worker housing projects.
Soumis le 21 novembre 2025 2:20 PM
Commentaire sur
Proposition de modification de la Loi sur les ressources en eau de l’Ontario pour permettre de réglementer des systèmes d’égouts supplémentaires en vertu du Code du bâtiment afin de favoriser la construction de logements pour les ouvriers agricoles sur le
Numéro du REO
025-0900
Identifiant (ID) du commentaire
172727
Commentaire fait au nom
Statut du commentaire