The ministry has issued an amendment to the ECA 5089-BZZP82 to upgrade the sewage systems servicing Camp Kintail located at 85153 Bluewater Highway, in the Township of Ashfield-Colborne-Wawanosh, County of Huron, Ontario.
Permit to Take Water No. P-300-1249970067 has been issued to M&R Commercial Properties Inc. for construction dewatering purposes. Water will be taken from one well from the City of Markham, Ontario.
December 6, 2024 - January 5, 2025 (30 days) Closed
Last updated
This decision is to refuse the renewal of Permit to Take Water No. 5651-C8UMSW for 2543174 Ontario Ltd., for snowmaking purposes. Water was requested to be taken from one pond related to snowmaking activities, located in the City of Thunder Bay, Ontario.
The Director of Exploration has made a decision on the exploration permit application PR-25-000074 to Sparton Resources Inc. for early exploration activities.
The decision is to issue the mineral exploration permit.
This proposal is for a new Environmental Compliance Approval to establish and operate a sewage works with a total daily design flow of 41,250 litres per day to serve Longbow Lake Bible Camp located at 553 Longbow Lake, Kenora, Ontario.
Approval is granted for a new multi-site Environmental Compliance Approval (geothermal) for 12801574 Canada Inc. to install vertical closed loop geothermal systems. 12801574 Canada Inc. operates across Ontario drilling boreholes and installing closed loop geothermal heat exchangers in these boreholes.
The Permit to Take Water No. P-300-6298735837 V1.0 was issued to Legendary Ore Mining Corporation on June 13, 2025, to renew the Permit No. 5062-9Q3L3K. Water will be taken from one pond for the purposes of mine dewatering at Alexo Open Pit, located in District of Cochrane, Ontario.
This proposal is for a new Environmental Compliance Approval (industrial sewage) for Walker Aggregates Inc.. This application is for the collection, transmission, treatment and disposal of washwater from an aggregate washing plant and stormwater run-off.
This proposal is for a new Environmental Compliance Approval (industrial sewage) for ten mobile sewage facilities (wastewater holding tanks) owned by Terra Water Systems Inc. and operated anywhere in the province of Ontario.
September 3, 2024 - October 18, 2024 (45 days) Closed
Last updated
We have issued an amended ECA (waste disposal site) No. A030303 for the Petrolia Landfill, a 26.02 hectares closed landfill within a total site area of 41.23 hectares located at 4052 Oil Heritage Road South, Petrolia, Ontario, for evaluation of various methane measurement technologies to be conducted by St. Francis Xavier University.
We have approved amendments to the Trent Source Protection Plan including the Trent Assessment Report. These amendments involve updating the vulnerable area mapping for a new well for the City of Kawartha Lakes’ King’s Bay drinking water system.
Permit to Take Water No. 8737-DGVNRX has been issued to Winchester Golf Club Ltd. for golf course irrigation purposes. Water will be taken from one pond located in the City of Whitby, Ontario.
Permit to Take Water (PTTW) No. P300-6293066621 version 2.0 has been issued to Abacus Equity Infusion Limited for construction dewatering purposes. Water will be taken from four ponds located in the Town of Whitby, Ontario.
September 29, 2023 - November 13, 2023 (45 days) Closed
Last updated
Approval is granted for a new Environmental Compliance Approval (industrial sewage) for 2258141 Ontario Inc., for sewage works serving 327 Sovereign Road located in the City of London, Ontario.
An Environmental Compliance Approval (air & noise) was issued for Magna Seating Inc., operating as Qualtech Seating Systems, an automotive seating manufacturing facility, located at 3915 Commerce Road in the City of London, Ontario.
Approval is granted to amend the existing Environmental Compliance Approval No. A592001 issued to Red Rock Mill Development Inc. for the use and operation of a waste disposal site located in Red Rock, Ontario.
August 26, 2024 - October 10, 2024 (45 days) Closed
Last updated
The ministry has issued a new Environmental Compliance Approval for industrial stormwater management works serving Northfield Development Corporation, located at Lot 13, Concession 1WHS, in the Town of Mono.
November 7, 2024 - December 22, 2024 (45 days) Closed
Last updated
The ministry has issued a new Environmental Compliance Approval to Hydro One Networks Inc. for industrial stormwater management works serving the Russell Transmission Station located at 1731 Russell Road, in the City of Ottawa, Ontario.