We have issued a new Environmental Compliance Approval to Cole's Metal Fabricating Ltd. for its metal fabrication facility located at 1195 Westcott Road, Windsor.
This proposal is for the renewal of the Limited Operational Flexibility for an Environmental Compliance Approval (air & noise) No. 1679-9RESSS for Univar Solutions Canada Ltd., a facility that receives, distributes, and blends chemical ingredients to create finished chemical products, located in Guelph, Ontario.
November 25, 2025 - January 9, 2026 (45 days) Closed
Last updated
A renewal of an Environmental Compliance Approval with Limited Operational Flexibility (air & noise) was issued to Da-Lee Environmental Services Inc., an industrial waste treatment and transfer facility, located in Stoney Creek, Hamilton, Ontario.
Facility Production Limit is set out in the facility’s approval (waste).
This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (air) from Washington Mills Electro Minerals Corporation, a production facility for standard abrasive grain and specialty electro-fused minerals, located in Niagara Falls, Ontario.
February 4, 2026 - March 21, 2026 (45 days) Closed
Last updated
This proposal is for an amendment to Environmental Compliance Approval (ECA) number 0325-8F8HLY for Re-Eco Tech Electronic Conversions Ltd., operating as ERS International (ERS), for its facility located at 2450 Lawrence Avenue East, Units 3-15, Toronto, Ontario.
July 18, 2025 - September 1, 2025 (45 days) Closed
Last updated
Approval has been granted for an Environmental Compliance Approval with Limited Operational Flexibility (air) which replaces all the current Environmental Compliance Approvals for Air at this facility and includes the addition of new or historically unapproved sources for all emissions from Select Property Ventures Inc.
October 21, 2025 - December 5, 2025 (45 days) Closed
Last updated
Approval is granted to amend the existing site waste approval by amending condition 6.1 to incorporate regulatory changes made to the blue box recycling program.
This proposal is for a new Environmental Compliance Approval (air) for 11166948 Canada Inc., operating a truck trailer manufacturing and repair facility, located in Thornloe, Ontario.
This proposal is for the renewal of the Limited Operational Flexibility for an Environmental Compliance Approval (air & noise) No. 0083-A2NLT4 for ArcelorMittal Canada MP Inc. ArcelorMittal Canada PM Inc. and ArcelorMittal Canada Inc., operating as ArcelorMittal Tubular Products Canada G.P./ArcelorMittal Produits Tubulaires Canada S.E.N.C.
This proposal is for a new Environmental Compliance Approval (air) for Cross Country Concrete Ontario Limited, a manufacturer of ready-mix concrete, located in Guelph, Ontario.
This proposal is for the renewal of the Limited Operational Flexibility for an Environmental Compliance Approval (air & noise) No. 8357-AGPMET for Kimberly-Clark Inc., a tissue manufacturing facility located in the Town of Huntsville, Ontario.
February 17, 2026 - April 3, 2026 (45 days) Closed
Last updated
This proposal is for a New Environmental Compliance Approval (air & noise) for Stemmler Meats and Cheese (Heidelberg) Incorporated, a facility that produces smoked meat, located in the City of Waterloo, Ontario.
October 28, 2024 - December 12, 2024 (45 days) Closed
Last updated
This proposal is for the renewal of the Limited Operational Flexibility for an Environmental Compliance Approval (air & noise) No. 6245-9CBRLP for TransAlta Cogeneration Ltd., as general partner for and on behalf of TransAlta Cogeneration L.P., a co-generation plant, located in the City of Ottawa, Ontario.
February 17, 2026 - April 3, 2026 (45 days) Closed
Last updated
This proposal is for a new Environmental Compliance Approval (air) for Tok Tires Limited, a facility that retreads commercially used tires, located in Orillia, Ontario.
September 14, 2023 - October 29, 2023 (45 days) Closed
Last updated
This proposal is for a new multi-site (mobile) Environmental Compliance Approval for FISHER ENGINEERING LIMITED for the installation of vertical closed loop geothermal systems throughout the Province of Ontario.
This proposal is for an Environmental Compliance Approval (waste disposal site) for a non-hazardous solid waste transfer and process facility in the City of Greater Sudbury.
February 27, 2026 - April 13, 2026 (45 days) Closed
Last updated
This proposal is for an amendment to the Limited Operational Flexibility for an Environmental Compliance Approval (air & noise) No. 0096-9JLJ5C for Magellan Aerospace Limited, manufacturing light alloy castings primarily for the international aerospace industry located in the City of Haley, Ontario.
February 27, 2026 - April 13, 2026 (45 days) Closed
Last updated
This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (air) which replaces all the current Environmental Compliance Approvals for Air at this facility and includes the addition of new or historically unapproved sources for all emissions from Central Stampings Limited.
Anew Environmental Compliance Approval is issued for a composting facility at 310 Riverside Drive in Nanticoke, Ontario.
The 10.1 hectare site is currently operating as a leaf and yard waste composting facility in accordance with Ontario Regulation 101/94 Recycling and Composting of Municipal Waste.