November 25, 2025 - January 9, 2026 (45 days) Closed
Last updated
An amendment and renewal to the Limited Operational Flexibility for an Environmental Compliance Approval (air & noise) No. 3245-AAHLHL was issued to CM Greenfield Power Corp., a power generation facility, located in the St. Clair Township, Ontario.
January 27, 2026 - March 13, 2026 (45 days) Closed
Last updated
This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (air & noise) for all emissions from In-Tek Inc., a plastic and metal parts coating facility, located in the Municipality of Chatham-Kent, Ontario.
January 30, 2026 - March 16, 2026 (45 days) Closed
Last updated
This proposal is to amend the Environmental Compliance Approval (air & noise) No. 8-6025-98-007 for Aevitas Inc., a facility that processes, stores and transfers PCB, hazardous & liquid industrial wastes, industrial metal wastes and non-hazardous solid materials, located in the Town of Kirkland Lake, Ontario.
We have issued a new Environmental Compliance Approval to Cole's Metal Fabricating Ltd. for its metal fabrication facility located at 1195 Westcott Road, Windsor.
November 25, 2025 - January 9, 2026 (45 days) Closed
Last updated
A renewal of an Environmental Compliance Approval with Limited Operational Flexibility (air & noise) was issued to Da-Lee Environmental Services Inc., an industrial waste treatment and transfer facility, located in Stoney Creek, Hamilton, Ontario.
Facility Production Limit is set out in the facility’s approval (waste).
This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (air) from Washington Mills Electro Minerals Corporation, a production facility for standard abrasive grain and specialty electro-fused minerals, located in Niagara Falls, Ontario.
July 18, 2025 - September 1, 2025 (45 days) Closed
Last updated
Approval has been granted for an Environmental Compliance Approval with Limited Operational Flexibility (air) which replaces all the current Environmental Compliance Approvals for Air at this facility and includes the addition of new or historically unapproved sources for all emissions from Select Property Ventures Inc.
October 21, 2025 - December 5, 2025 (45 days) Closed
Last updated
Approval is granted to amend the existing site waste approval by amending condition 6.1 to incorporate regulatory changes made to the blue box recycling program.
October 28, 2024 - December 12, 2024 (45 days) Closed
Last updated
This proposal is for the renewal of the Limited Operational Flexibility for an Environmental Compliance Approval (air & noise) No. 6245-9CBRLP for TransAlta Cogeneration Ltd., as general partner for and on behalf of TransAlta Cogeneration L.P., a co-generation plant, located in the City of Ottawa, Ontario.
February 17, 2026 - April 3, 2026 (45 days) Closed
Last updated
This proposal is for a New Environmental Compliance Approval (air & noise) for Stemmler Meats and Cheese (Heidelberg) Incorporated, a facility that produces smoked meat, located in the City of Waterloo, Ontario.
September 14, 2023 - October 29, 2023 (45 days) Closed
Last updated
This proposal is for a new multi-site (mobile) Environmental Compliance Approval for FISHER ENGINEERING LIMITED for the installation of vertical closed loop geothermal systems throughout the Province of Ontario.
February 27, 2026 - April 13, 2026 (45 days) Closed
Last updated
This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (air) which replaces all the current Environmental Compliance Approvals for Air at this facility and includes the addition of new or historically unapproved sources for all emissions from Central Stampings Limited.
February 27, 2026 - April 13, 2026 (45 days) Closed
Last updated
This proposal is for an amendment to the Limited Operational Flexibility for an Environmental Compliance Approval (air & noise) No. 0096-9JLJ5C for Magellan Aerospace Limited, manufacturing light alloy castings primarily for the international aerospace industry located in the City of Haley, Ontario.
Anew Environmental Compliance Approval is issued for a composting facility at 310 Riverside Drive in Nanticoke, Ontario.
The 10.1 hectare site is currently operating as a leaf and yard waste composting facility in accordance with Ontario Regulation 101/94 Recycling and Composting of Municipal Waste.
August 15, 2024 - September 29, 2024 (45 days) Closed
Last updated
This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (air & noise) for Lafarge Canada Inc., a reclaimed concrete and asphalt pavement crushing plant, located in the City of Mississauga, Ontario.
This approval is for a New Environmental Compliance Approval (air & noise) for YORK1 Field Recycling Ltd., for the operation of a waste processing site to be used for the recycling, processing, and transfering of solid nonhazardous waste, located in Nanticoke, Ontario.
This approval is for an amendment to the Limited Operational Flexibility for an Environmental Compliance Approval (air) No. 4487-9XTJAM for Vari-Form Manufacturing Inc., an automotive parts manufacturing facility located in the Township of Strathroy-Caradoc, Ontario.
This proposal is to amend Environmental Compliance Approval (air & noise) No. 1984-BD9NBD, issued to Southgate Renewables GP Inc., as general partner for and on behalf of Southgate Renewables LP, an anaerobic digester facility located at 160 Eco Parkway, Dundalk, Ontario.