Instrument type:
Permit for species protection or recovery
ERO number
019-1184
Notice type
Instrument
Notice stage
Decision
Decision posted
Proposal posted
Comment period
March 5, 2020 - April 4, 2020 (30 days) Closed
Last updated
The Minister of the Environment, Conservation and Parks issued a permit under the Endangered Species Act, 2007 to Natural Resource Solutions Inc. to continue a multi-faceted recovery project for Mottled Duskywing at 16 study sites across Ontario.
August 8, 2018 - September 22, 2018 (45 days) Closed
Last updated
An Environmental Compliance Approval (Waste Site) #18-SAR-28504 was issued for Stewart Saul Enterprises Ltd. (Central Sanitation) on September 28, 2018 for a hauled sewage site located in Corunna, Ontario.
Permit to Take Water No. 4314-C5EK2L for IAMGOLD Corporation has been amended. Water will be taken from two lakes for industrial purposes (dust suppression), located in the District of Sudbury, Ontario.
September 16, 2024 - November 12, 2024 (57 days) Closed
Last updated
This proposal is for an amendment to the Limited Operational Flexibility for an Environmental Compliance Approval (air & noise) No. 0312-9NVJDB for Accuride Canada Inc., a light and heavy truck wheel production facility located in the City of London, Ontario.
The ARA Regulation and the Aggregate Resources of Ontario Provincial Standards have been amended to change the way in which aggregates are managed in Ontario.
The Director of Exploration has made a decision on the White Metal Resources Corp./Benton Resources Inc. exploration permit application PR-20-000161 to White Metal Resources Corp./Benton Resources Inc. for early exploration located approximately 80 kilometres northwest of Thunder Bay, Ontario, in Drift Lake Area, Conacher Township.
October 29, 2025 - January 16, 2026 (79 days) Open
Last updated
This proposal is to amend the Environmental Compliance Approval (air & noise) No. 4396-B5TQNE for Shell Canada OP Inc. and Shell Canada Limited as general partners for and on behalf of Shell Canada Products, a petroleum refinery located in the Township of St. Clair, Ontario.
We amended Renewable Energy Approval No. 5515-8WDH5G for the Kingston Gardiner Hwy 2 South Solar Energy Project, located at Lot 40, Concession 3 in Loyalist Township, to move to an annual effluent monitoring schedule for the transformer substation spill containment facility.
Instrument type:
Issuance of a licence to remove over 20,000 tonnes of aggregate annually from a pit or a quarry
ERO number
019-0101
Notice type
Instrument
Notice stage
ProposalUpdated
Proposal posted
Comment period
May 23, 2019 - July 8, 2019 (46 days) Closed
Last updated
Beck’s Construction has applied for a Class A licence (Category 3 – Pit Above Water) to excavate aggregate. This application is for the establishment of a new pit.
December 17, 2019 - January 31, 2020 (45 days) Closed
Last updated
A Certificate of Property Use was issued to 2484224 Ontario Limited for the continued industrial/commercial use of the property located at 325 Eramosa Road in the City of Guelph.
September 7, 2022 - October 22, 2022 (45 days) Closed
Last updated
This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (air) for Meridian Lightweight Technologies Inc., a magnesium auto parts manufacturing facility located in the Township of Strathroy-Cardoc, Ontario.
This proposal is to amend the Environmental Compliance Approval (air and noise) No. 9174-6Z8P2G for Lafarge Canada Inc., for their aggregate quarry with crushing, screening, and washing operations, located in Meldrum Bay, Ontario.
This proposal is for a new Environmental Compliance Approval (air & noise) for Truckcap 94 Limited, a tire retreading facility located in Brantford, Ontario.
February 9, 2024 - March 25, 2024 (45 days) Closed
Last updated
This proposal is for an amendment to Environmental Compliance Approval No. 8-5042-93-947 (air and noise) issued to C. VILLENEUVE CONSTRUCTION CO. LTD., a mobile asphalt facility in Ontario.
August 2, 2023 - September 16, 2023 (45 days) Closed
Last updated
This proposal is for a new Environmental Compliance Approval (air & noise) for De Beers Canada Inc. for the approval of a temporary camp, located at the Victor Mine site, which will include the operation of a small batch type incinerator to manage camp waste that will be generated.
February 28, 2024 - April 13, 2024 (45 days) Closed
Last updated
Approval has been granted for an amendment to Environmental Compliance Approval (air and noise) No. 6518-97RLTQ for GP North Woods ULC, for a strand board manufacturing facility, located in the Town of Englehart, Ontario.
This is for an Environmental Compliance Approval with Limited Operational Flexibility (air) for Molten Metallurgy Inc., a steel and iron castings manufacturing facility located in Paris, Ontario.