December 7, 2023 - January 21, 2024 (45 days) Closed
Last updated
This approval is for a New Environmental Compliance Approval (air & noise) for the Carbon Upcycling Technology (CUT) process for the Ash Grove Mississauga Cement Plant, owned by CRH Canada Group Inc., a cement manufacturing facility located in the City of Mississauga, Ontario.
September 27, 2024 - November 11, 2024 (45 days) Closed
Last updated
We are moving forward with regulatory amendments to enable Metrolinx and other transit authorities to make changes to sewage and water works more easily, helping to deliver transit projects faster while maintaining environmental oversight.
The ministry has accepted the risk assessment prepared for the owner, FS Orillia GP Inc., as part of the development plans for the property located at 70 Front Street North - Central Parcel in Orillia, Ontario.
The director is considering issuing a Certificate of Property Use in relation to the property.
Permit to Take Water No. P-300-1336111714 has been issued to Camp Muskoka Corporation for campground water supply purposes. Water will be taken from three wells located in the Town of Bracebridge, Ontario.
February 26, 2024 - April 11, 2024 (45 days) Closed
Last updated
A new Environmental Compliance Approval has been issued for industrial sewage treatment and stormwater management works serving Arriscraft Canada Inc., located at 875 Speedsville Road in Cambridge, Ontario.
This proposal is for a new Environmental Compliance Approval (sewage) owned by Vaughan 1E Energy Storage 1 GP Inc. as general partner for and on behalf of Vaughan 1E Energy Storage 1 LP, for the establishment of sewage works infrastructure, in support of a proposed Battery Energy Storage System facility, located at 8118 Dufferin Street, in Vaughan.
This proposal is to amend the Environmental Compliance Approval (air & noise) No. 8480-B2ZFQ3 for Fleet Canada Inc., a facility that manufactures fabricated aluminium and composite aircraft components, located in the Town of Fort Erie, Ontario.
This proposal is for a new Environmental Compliance Approval (sewage) for the proposed use of a sewage system that services the property known as Loon's Landing, located at 263 A Hass Road, in Alban, Ontario. The proposed sewage works include the use of four septic tanks.
An amendment for the Environmental Compliance Approval (air & noise) No. 1242-AMTSXM has been issued to Miller Paving Limited, for the operation of a mobile hot-mix asphalt (HMA) plant.
An Environmental Compliance Approval (air & noise) with the Limited Operational Flexibility has been granted to Nachurs Alpine Solutions Inc., a liquid fertilizer manufacturing facility, located in New Hamburg, Ontario.
The 2024 Apiculture winter loss report is now available. This report is an annual written account of the estimation of honey bee colony winter loss for both commercial and small-scale beekeepers as well as a summary of the management practices used by beekeepers to monitor and control pests and diseases.
July 18, 2024 - September 1, 2024 (45 days) Closed
Last updated
We have issued a new Environmental Compliance Approval (waste disposal site) for an enclosed non-hazardous solid waste transfer and processing facility. This transfer site is an approximately 1.1-hectare property located in the City of Ottawa, and will receive a maximum of is one tonne per day and 220 tonnes annually solid-non-hazardous waste.
December 9, 2024 - January 23, 2025 (45 days) Closed
Last updated
The ministry has issued a new Environmental Compliance Approval for the establishment of year round subsurface sewage disposal works rated at 1,600 litres per day, to service a private residential cottage located at Part Lot 17, Concession 3, in the Township of Mapleton.
This proposal is for a new Environmental Compliance Approval for the establishment of stormwater management facilities owned by G. Tackaberry & Sons Construction Company Limited for the collection, transmission, treatment and disposal of stormwater run-off from a site located at 3893 Highway 15, Joyceville, City of Kingston, Ontario.
The minister has approved amendments to Saugeen Valley Assessment Report and Saugeen, Grey Sauble, Northern Bruce Peninsula Source Protection Plan including updates to the Minto Pines and Scott Point drinking water systems to add two municipal drinking water wells as well as minor policy changes for septic system inspections and snow storage.
The Director of Exploration has made a decision on the exploration permit application PR-25-000021 to Voltage Metals Incorporated for early exploration activities.
The decision is to issue the mineral exploration permit.
This proposal is for an amendment to the Limited Operational Flexibility for an Environmental Compliance Approval (Air & Noise) No. A-500-9204118096 for VUTEQ CANADA INC, a manufacturing facility located at 920 Keyes Drive in Woodstock, Ontario.
This proposal is for a new Environmental Compliance Approval (air & noise) for T C CHROME (2005) LTD, a hard chrome plating facility, located at 14 Skagway Avenue, Toronto, Ontario.
A new sewage works Environmental Compliance Approval (ECA) was granted to Ponterio Developments Inc. for stormwater management (SWM) works to serve a total catchment area of 1.26 ha of a proposed Building development at West End Business Park, located at 1351 Kelly Lake Road, City of Greater Sudbury, ON, P3E 5P5.