October 31, 2023 - December 15, 2023 (45 days) Closed
Last updated
Approval is granted for a new Environmental Compliance Approval (industrial sewage) for Woodbine One GP Inc. for the installation of a stormwater management system as part of the proposed storage and distribution centre, located at 18574, 18818 and 18948 Woodbine Avenue, in the Town of East Gwillimbury, Ontario.
Permit to Take Water No. 6176-DG6HG5 was issued on May 27, 2025, to renew Permit to Take Water No. 4155-9UNJ57 for aggregate washing purposes. Water will be taken from one wash pond in Grey Highlands for 10 years.
We issued an Amended Environmental Compliance Approval (air) to consolidate Environmental Compliance Approval (air) Nos. 8-1026-90-916, 8-1129-93-006 and 8-1048-94-967 for 1644451 Ontario Ltd., operating as Canflow Environmental Services (2005), a commercial waste processing and transfer facility, located in the Township of Enniskillen,
This proposal is to amend the Environmental Compliance Approval (air & noise) No. 9205-6TKPTF for Shell Canada OP Inc. and Shell Canada Limited as general partners for and on behalf of Shell Canada Products, a petroleum refinery located in the Township of St. Clair, Ontario.
The establishment of industrial process water management to service Coloured Aggregates Inc's Washing Facility via a closed loop settling pond, for the collection and treatment of effluent water from the wash plant to allow this effluent to be continuously recycled and only overflows to be discharged into a culvert within the owners land.
This proposal is for a new Permit to Take Water for Great Bear Resources Ltd. Water will be taken from one watercourse and six wells for the Advanced Exploration Program operation, located approximately 25 kilometres southeast of the Municipality of Red Lake, Ontario.
Permit to Take Water No. 0651-DGUPUP has been issued to Law Cranberry Resort Limited for the purpose of golf course irrigation. Water will be taken from one source in Collingwood, Simcoe.
This proposal is for a new Environmental Compliance Approval (air & noise) for Mainway Metalworks Inc., a metal stamping facility, located in the City of Burlington, Ontario.
This proposal is for a new Environmental Compliance Approval (sewage) for 1108 Queen Street, in the Township of Wilmot, Ontario, for the establishment of a replacement subsurface disposal works for the collection, transmission, treatment and disposal of domestic sewage with a maximum design capacity of 15,000 litres per day.
This proposal is for a new Environmental Compliance Approval (sewage) for 1088414 Ontario Ltd., for an existing sewage works system for the treatment and disposal of domestic sewage to service the Glen Allan Trailer Park, located at 136 Glen Allan Park Lane in Marmora and Lake, Ontario.
This proposal is for a new Environmental Compliance Approval (sewage) to establish sanitary and stormwater management works structures servicing a proposed Volta Estate Winery, located at 17945 Loyalist Parkway in County of Prince Edward, Ontario.
This proposal is for a new Environmental Compliance Approval for new Class 4 onsite sewage disposal works, with a daily maximum flow of 63 000 litres per day, to service Cambridge Country Manor, a nursing home located at 3680 Speedsville Road in the City of Cambridge, Ontario.
December 9, 2024 - January 23, 2025 (45 days) Closed
Last updated
An Environmental Compliance Approval with Limited Operational Flexibility (air & noise) has been granted to 2871282 Ontario Inc., operating a metal finishing facility, located in the City of St. Catharines, Ontario.
July 22, 2024 - September 5, 2024 (45 days) Closed
Last updated
A new Environmental Compliance Approval has been issued to A & A Environmental Consultants Inc., for one mobile in-situ remediation system to be used throughout Ontario.
September 9, 2024 - October 24, 2024 (45 days) Closed
Last updated
An amended Environmental Compliance Approval (air & noise) with Limited Operational Flexibility was issued to Umicore Precious Metals Canada Inc., a precious metal refinery and production facility located in the City of Markham, Ontario.
January 25, 2024 - March 10, 2024 (45 days) Closed
Last updated
This proposal is for a new Environmental Compliance Approval for the establishment of a Year Round subsurface sewage disposal works rated at 13,800 litres per day, to service a commercial plaza located at 871 Ward Street, in the Township of Selwyn, Ontario.
An Environmental Compliance Approval (air and noise) with operational flexibility was issued for BRUSSELS AGROMART LTD., a dry and liquid fertilizer, chemical herbicides and seed storage and blending facility, located in Brussel, Ontario.
Instrument type:
Permit for activities to achieve an overall benefit to a species
ERO number
019-5569
Notice type
Instrument
Notice stage
Decision
Decision posted
Proposal posted
Comment period
August 25, 2022 - September 24, 2022 (30 days) Closed
Last updated
The Minister of the Environment, Conservation and Parks has issued an overall benefit permit to Clublink Corporation ULC for development activities that will impact Butternut. The permit includes actions to minimize adverse effects and actions to benefit the species, as well as monitoring and reporting requirements.
Instrument type:
Changes to the site plan for a pit or quarry
ERO number
019-8942
Notice type
Instrument
Notice stage
Decision
Decision posted
Proposal posted
Comment period
August 7, 2024 - October 7, 2024 (61 days) Closed
Last updated
Approval was granted for a site plan amendment to allow Nicli Aggregates Inc. in the Municipality of Thames Centre to reduce the north setback to 0m changing the final depth of extraction from above the water table to below the water table in this area of the site.