Instrument type:
New - Approval to amend a municipality’s official plan – when subject to appeal
ERO number
026-0977
Notice type
Instrument
Notice stage
Exception
Exception posted
Last updated
The Minister of Municipal Affairs and Housing has issued an order under section 23 of the Planning Act to redesignate certain areas designated as General Employment Areas in four locations within the City of Toronto to Mixed Use and Institutional Areas in the City’s Official Plan.
September 25, 2026 - November 9, 2026 (45 days) Open
Last updated
This proposal is for an amendment to the Environmental Compliance Approval (ECA) No. 4822-CLPHT4 to install stormwater management (SWM) works serving Phase 3 of the proposed greenhouse expansion for the collection, transmission, treatment, and disposal of stormwater run-off from the lands located in the Town of Kingsville.
Permit to Take Water No. P-300-6427375704 was issued to Bonnechere Excavating Inc to renew Permit to Take Water No. 4536-A8XQNH for aggregate extraction purposes. Water will be taken from one source (quarry) in Stafford, Ontario for 10 years.
September 17, 2025 - November 1, 2025 (45 days) Closed
Last updated
Approval has been granted to amend the Environmental Compliance Approval (air and noise) No. 8909-7BQQS9 for Eureka Wearmax Grinding Industries Inc., a tool and die welding product manufacturing facility, specializing in surface grinding, blanchard grinding, and shear blade reconditioning, located in the City of Hamilton, Ontario.
September 25, 2026 - November 9, 2026 (45 days) Open
Last updated
This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (air) which replaces all the current Environmental Compliance Approvals for Air at this facility and includes the addition of new or historically unapproved sources for all emissions from 511414 Ontario Limited.
September 24, 2026 - November 8, 2026 (45 days) Open
Last updated
This proposal is for an amendment to the Environmental Compliance Approval (sewage) No. 1159-DKQ52S for the replacement of Works for the treatment of sanitary sewage and subsurface disposal of treated effluent from the Larose Forest Mobile Home Park located at 1210 St. Felix Road, on Part of Lot 23, Concession 8, in the City of Clarence-Rockland.
The Minister has approved amendments to the Thames-Sydenham and Region Source Protection Plan and St. Clair Region Assessment Report. Updates include the Petrolia drinking water system’s vulnerable areas in Lambton County, including a new intake, to reflect current CWA technical rules.
Instrument type:
Changes to the site plan for a pit or quarry
ERO number
026-0138
Notice type
Instrument
Notice stage
Decision
Decision posted
Proposal posted
Comment period
February 19, 2026 - March 23, 2026 (32 days) Closed
Last updated
Approval was granted for a site plan amendment to allow Cambridge Aggregates Inc. increase in the annual tonnage limit for the site to 1,500,000 tonnes in the Township of North Dumfries
December 19, 2025 - February 2, 2026 (45 days) Closed
Last updated
A new Environmental Compliance Approval was granted for the establishment of subsurface sewage disposal works to service a residence located at 403 East Clover Beach Road, in the Township of Shuniah.
September 23, 2026 - November 7, 2026 (45 days) Open
Last updated
This proposal is for the renewal of the Limited Operational Flexibility for an Environmental Compliance Approval (air & noise) No. 3026-AMAHQE for Samuel, Son and Co., Limited, operating as Nelson Steel division of Samuel, Son and Co., Limited, operating a steel pickling and steel slitting facility located in the City of Hamilton, Ontario.
An amendment was issued to Environmental Compliance Approval (waste disposal site) No. 6535-DJPQ46 for a non-hazardous materials processing facility in the City of Kingston.
February 20, 2024 - April 5, 2024 (45 days) Closed
Last updated
Approval has been granted for a new Environmental Compliance Approval (air & noise) for TRIPLE M METAL CORP. as general partner for and on behalf of TRIPLE M METAL LP, for the operation of a mobile metal recycling and processing facility equipped with one screener.
November 5, 2025 - December 20, 2025 (45 days) Closed
Last updated
Approval has been granted for an Environmental Compliance Approval with Limited Operational Flexibility (air & noise) from Dana Canada Corporation, a manufacturer of heat exchanger products for the automotive industry and an operator of a ground water remediation system, located in the City of Cambridge, Ontario.
September 23, 2026 - October 23, 2026 (30 days) Open
Last updated
This proposal is for a renewal to Permit to Take Water No. 3277-AG7HS8 for FLEMINGDON PARK GOLF CLUB INC. Water will be taken from Don River for golf course irrigation purposes in North York, Ontario.
September 23, 2026 - October 23, 2026 (30 days) Open
Last updated
This proposal is for a renewal to Permit to Take Water No. 3357-AHALK5 for OSPREY LINKS LTD. Water will be taken from one pond for golf course irrigation purposes in Callander, Ontario.