August 28, 2025 - September 27, 2025 (30 days) Closed
Last updated
The Director of Exploration has made a decision on the exploration permit application PR-25-000170 to Panther Metals and Fulcrum Metals Canada No. 2 for early exploration activities.
The decision is to: issue the mineral exploration permit.
January 2, 2025 - February 16, 2025 (45 days) Closed
Last updated
We issued an Environmental Compliance Approval with Limited Operational Flexibility to Toyota Boshoku Canada, Inc., a vehicle parts manufacturing facility, located in the Township of Woolwich, Ontario.
We have issued an Environmental Compliance Approval (air & noise) to ARCELORMITTAL CANADA INC. and ARCELORMITTAL CANADA MP INC. ARCELORMITTAL CANADA PM INC. as general partners for and on behalf of ARCELORMITTAL DOFASCO G.P./ARCELORMITTAL DOFASCO S.E.N.C., for a manufacturing facility located in Windsor, Ontario.
October 10, 2025 - November 24, 2025 (45 days) Open
Last updated
This proposal is for a new Environmental Compliance Approval for the establishment of subsurface sewage disposal works rated at 1,600 litres per day, to service a cottage located at 30 Third Line Road, in the Township of Centre Wellington.
October 10, 2025 - November 9, 2025 (30 days) Closed
Last updated
The Ministry of Energy and Mines (MEM) is refining the study area for the Northwest GTA Transmission Corridor Identification Study. This would be the last substantial revision to the study area, to be preserved in the long term until transmission infrastructure is constructed.
October 10, 2025 - November 9, 2025 (30 days) Closed
Last updated
This proposal is for a new Environmental Compliance Approval (air & noise) for Barn Angels Composting Inc. a deadstock incineration facility, located in Georgetown, Ontario.
January 8, 2025 - February 22, 2025 (45 days) Closed
Last updated
An Environmental Compliance Approval was issued to Willowbrook Nurseries Inc. for stormwater storage/irrigation works serving a existing wholesale plant nursery greenhouse site located at Lots 18 to 20, Concession 10, in the Town of Pelham.
October 10, 2025 - November 9, 2025 (30 days) Closed
Last updated
This proposal is for a new Environmental Compliance Approval for an existing stormwater management facility for Brookdale Treeland Nurseries Limited, located at three adjacent & connected properties: 6050 17th Sideroad, 15450 Highway 27, and 15500 Highway 27, Schomberg, Ontario.
October 10, 2025 - November 24, 2025 (45 days) Open
Last updated
The proposal is for a new Environmental Compliance Approval (sewage) for Riverside 360 Inc. This application is for the approval of stormwater management works to serve an industrial manufacturing facility with associated parking and driveways development site located at 2042 Victory Court, in the City of London.
This decision is for a new Environmental Compliance Approval for sewage facilities owned and operated by Driftwood Park Inc., servicing Driftwood Park Mobile Homes at the property located at 72931 Bluewater Highway, in the Town of Zurich, municipality of Bluewater, Huron County, Ontario.
The Permit to Take Water No. P-300-1364497314 v1.0 was issued to Crofters Food Ltd. on October 8, 2025. Water will be taken from two wells for the purposes of food processing, located in Seguin, Ontario.
October 9, 2025 - November 23, 2025 (45 days) Open
Last updated
This proposal is for a new Environmental Compliance Approval (industrial sewage works) for site located at 633 Coronation Drive. The application is in support of the entire site, serving several entities doing various industrial operations such as waste and recycling transfer station, excess soil receiving facility and offices.
October 9, 2025 - November 23, 2025 (45 days) Open
Last updated
This proposal is to amend Environmental Compliance Approval (waste disposal site) No. 6335-6FBNK7, issued to Greenflow Environmental Services Inc. for a solid, non-hazardous municipal waste facility on a site that is 0.67 hectares in area, located in the City of Hamilton.
October 9, 2025 - November 23, 2025 (45 days) Open
Last updated
The Ministry has accepted the risk assessment prepared for the owner, The Corporation of the City of Oshawa, for the property 150 Bond Street East, Oshawa.
The director is considering issuing a Certificate of Property Use (CPU) in relation to the property.
Certificate of Property Use No. 4202-DDVN82 was issued on October 6, 2025, to Tamarack (Rideau 2) Corporation for the intended parkland use of the property located at 998 Highway 15, City of Kingston.
October 9, 2025 - November 23, 2025 (45 days) Open
Last updated
This proposal is for a new Environmental Compliance Approval (sewage) for the installation of Class 4 Septic System to replace an existing old septic system servicing the residential dwelling located at 23 Sidoak Lane, City of Quinte West.
October 9, 2025 - November 23, 2025 (45 days) Open
Last updated
This proposal is for a new Environmental Compliance Approval (sewage) for the construction of sewage works serving an oil containment system for the collection, transmission, treatment and disposal of stormwater from the Transformer Spill containment areas at the Midland Lawrence Station located at 1365 Midland Avenue, in the City of Toronto.
October 9, 2025 - November 23, 2025 (45 days) Open
Last updated
This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (air) which replaces all the current Environmental Compliance Approvals for Air at this facility and includes the addition of new or historically unapproved sources for all emissions from National Steel Car Limited.