This proposal is for the renewal of the Limited Operational Flexibility for an Environmental Compliance Approval (air & noise) No. 0188-A3RQKS for C.A.I. Inks Canada Ltd., a manufacture of liquid inks and general industrial office activities facility, located in Prescott, Ontario.
The proposal is for a new Environmental Compliance Approval for industrial stormwater management works serving CHAR Tech Thorold GP Inc. as general partner for and on behalf of CHAR Bioveld Thorold LP, located at 3363 Davis Road, in the City of Thorold, Ontario.
This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (air & noise) for Crate 61 Organics Inc., a bar soap manufacturing facility, located in the City of Pickering, Ontario.
This proposal is to amend the Environmental Compliance Approval (air & noise) No. 4152-96GGTN for Wabi Iron & Steel Corp., operating a foundry providing various wear and heat resistant properties for a wide range of industrial clients and applications located in New Liskeard, Ontario.
October 22, 2025 - December 6, 2025 (45 days) Closed
Last updated
We have updated the Director’s Directions: Minimum Requirements for Operational Plans for municipal residential drinking water systems. This update provides flexibility to organizations operating multiple connected municipal residential drinking water systems while maintaining environmental protection.
We have issued an Environmental Compliance Approval with Limited Operational Flexibility to Heico 2004 Member, Inc. as the general partner for and on behalf of Ivaco Rolling Mills 2004 L.P., a electric arc furnace steelmaking facility located in L'Orignal, Ontario.
October 4, 2024 - November 18, 2024 (45 days) Closed
Last updated
Approval is granted to amend the existing site waste approval to allow maximum incoming rate of waste to 3,000 tonnes per day, based on annual average.
July 24, 2025 - September 7, 2025 (45 days) Closed
Last updated
This decision is for a new Environmental Compliance Approval for the establishment of seasonal subsurface sewage disposal works rated at 30,000 litres per day, to service Camp Howland youth camp located at 5373 Haliburton County Road 121, in the Township of Minden Hills, Ontario.
This proposal is for the renewal of the Limited Operational Flexibility for an Environmental Compliance Approval (air & noise) No. 4649-9PPJLK for Lincoln Electric Company of Canada GP 2 Limited as general partner for and on behalf of Lincoln Electric Company of Canada LP, an aluminum wire production facility, located in Mississauga, Ontario.
This proposal is for a new Environmental Compliance Approval (air & noise) for Clarke Construction Inc. for the operation of a mobile crushing plant, equipped with a crusher, a screener, a stacker and associated diesel engines.
This proposal is for the renewal of the Limited Operational Flexibility for an Environmental Compliance Approval (air & noise) No. 9158-A6JSHW for Sherwin Williams Canada Inc., for the mixing and production of solvent, water-borne paints, and stains as well as the associated product packaging operations, located in Fort Erie, Ontario.
The proposal is for an amendment to Environmental Compliance Approval (sewage) No. 6616-CLP7BM for Grace Family Farms Ltd. This application is for the approval of stormwater management works to serve a greenhouse located at 235 County Road 18, Leamington, Ontario.
December 6, 2021 - January 20, 2022 (45 days) Closed
Last updated
The Ministry of the Environment, Conservation and Parks has approved amendments to the Darlington Provincial Park Management Plan. The amended plan will allow for management of native wildlife and plants in the park, if needed, so we can protect park ecosystems.
December 22, 2025 - January 21, 2026 (30 days) Closed
Last updated
The Director of Exploration has made a decision on the exploration permit application PR-25-000261 to Argo gold Inc. for early exploration activities. The decision is to: issue the mineral exploration permit.
This proposal is for an amendment to Permit to Take Water No. P-300-6338405899 for R. W. TOMLINSON LIMITED. Water will be taken from one pond for aggregate extraction-dewatering purposes in Loyalist, Ontario.
Instrument type:
Approval to register for a technical standard for air pollution (industry standard)
ERO number
019-6359
Notice type
Instrument
Notice stage
ProposalUpdated
Proposal posted
Comment period
March 23, 2023 - May 7, 2023 (45 days) Closed
Last updated
This proposal is for C. Valley Asphalt Inc., located in Woodbridge, Ontario, to be registered under the Technical Standards Registry – Air Pollution. This facility will adhere to all technical and operational requirements in the Asphalt Mix – Industry Standard under the Local Air Quality Regulation (O. Reg. 419/05).
September 24, 2020 - November 8, 2020 (45 days) Closed
Last updated
This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (Air) for Shell Canada OP Inc. and Shell Canada Limited, as general partners for and on behalf of Shell Canada Products at the Petroleum Refinery located in Corunna, St. Clair Township, Ontario.
October 20, 2021 - December 4, 2021 (45 days) Closed
Last updated
This proposal is for an amendment to Environmental Compliance Approval (air & noise) No. 9230-8Q8K5P with Limited Operational Flexibility for Gerdau Ameristeel Corporation, an electric arc furnace steel mill and metal recycling facility located in the City of Whitby, Ontario.
We are proposing a technical standard for the carbon black sector that would include requirements to reduce sulphur dioxide air emissions from facilities that register to the technical standard. The proposed technical standard would help align the industry with similar environmental practices in other jurisdictions, such as the United States.